Permit Details

Status:
Complete
Type:
Right-of-Way (ROW) - Utility
Address NEW:
3140 S CAMINO SECO
Apply Date:
09/30/2025
Applicant:
Esteban Vega - Desert Barricades
Description:
WO T159290. TEP will be removing 1 pole in the ROW a 2'x2' hole will be backfilled. 12/02/25 - Request for 90 Day Renewal as of 12/13/2025

Permit Reviews

Permit Number - TR-UTL-0925-01694
Permit Status: Complete
Permit Description: WO T159290. TEP will be removing 1 pole in the ROW a 2'x2' hole will be backfilled. 12/02/25 - Request for 90 Day Renewal as of 12/13/2025
Start Date Submittal Complete Date Status  
09/30/2025 RIGHT-OF-WAY REVIEW v.1 10/02/2025 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TR-UTL-0925-01694
Permit Status: Complete
Permit Description: WO T159290. TEP will be removing 1 pole in the ROW a 2'x2' hole will be backfilled. 12/02/25 - Request for 90 Day Renewal as of 12/13/2025
Total Outstanding Activity Conditions - 4
Date Name
10/01/2025 BUS STOP IN THE AREA, CONTACT SUN TRAN DISPATCH, AT 520-206-8934 AT LEAST 48-BUSINESS HOURS PRIOR TO START OF WORK FOR COORDINATION.
10/01/2025 Pre-Activity Meeting Pre- activity meeting to be held 72 hrs in advance of work start with inspections.. PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING
10/01/2025 UNDER A PAVEMENT MORATORIUM, ANY NEW ASPHALT THAT IS DISTURBED WILL REQUIRE A 2” MILL AND OVERLAY FOR 25’ IN EACH DIRECTION FROM THE OUTSIDE OF THE CUT FOR ALL EFFECTED TRAVEL LANES.
10/01/2025 Traffic control set-up approved between 9AM - 3:30PM

Completed Inspections

Permit Status: Complete
Permit Number: TR-UTL-0925-01694
Permit Description: WO T159290. TEP will be removing 1 pole in the ROW a 2'x2' hole will be backfilled. 12/02/25 - Request for 90 Day Renewal as of 12/13/2025
Total Completed Inspections - 3
Date Description Inspector Results Comments
12/09/2025 TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting Passed A preconstruction inspection has passed and site is ready for work to begin. An extension of 90 days has been requested on this permit.
03/11/2026 TRSP - ROW - Backfill - Placement/Compaction Passed
03/11/2026 TRSP - ROW - Final Passed work has been completed and work area is back to original or better.

Documents

File Name Document Type  
COT - TR - ROW PERMIT.PDF DOCUMENTS VIEW
DB 71562 - 3140 S CAMINO SECO - SHOULDER CLOSURE - T159290_V1.PDF DOCUMENTS VIEW
T159290 MAP_V1.PDF DOCUMENTS VIEW