Permit: TR-UTL-0925-01675
Permit Details
Status:
Complete
Type:
Right-of-Way (ROW) - Utility
Address:
8911 E INDIAN BEND RD
Address NEW:
8911 E INDIAN BEND RD
Apply Date:
09/26/2025
Applicant:
Esteban Vega - Desert Barricades
Description:
WO T160572. TEP will be removing 3 poles in R/W in (dirt) 3- 2'x2' holes 6' deep will be backfilled, no sidewalk impact. 11/26/25- 90 DAY RENEWAL AS OF 12/09/25. NEW EXPIRATION 03/09/26
Permit Reviews
Permit Number - TR-UTL-0925-01675
Permit Status: Complete
Permit Description: WO T160572. TEP will be removing 3 poles in R/W in (dirt) 3- 2'x2' holes 6' deep will be backfilled, no sidewalk impact.
11/26/25- 90 DAY RENEWAL AS OF 12/09/25. NEW EXPIRATION 03/09/26
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 10/02/2025 | RIGHT-OF-WAY REVIEW v.2 | 10/02/2025 | APPROVED |
| 09/26/2025 | RIGHT-OF-WAY REVIEW v.1 | 10/01/2025 | REQUIRES RESUBMIT |
Outstanding Activity Conditions
Permit Number - TR-UTL-0925-01675
Permit Status: Complete
Permit Description: WO T160572. TEP will be removing 3 poles in R/W in (dirt) 3- 2'x2' holes 6' deep will be backfilled, no sidewalk impact.
11/26/25- 90 DAY RENEWAL AS OF 12/09/25. NEW EXPIRATION 03/09/26
Total Outstanding Activity Conditions - 3
| Date | Name |
|---|---|
| 09/26/2025 | UNDER A PAVEMENT MORATORIUM, ANY NEW ASPHALT THAT IS DISTURBED WILL REQUIRE A 2” MILL AND OVERLAY FOR 25’ IN EACH DIRECTION FROM THE OUTSIDE OF THE CUT FOR ALL EFFECTED TRAVEL LANES. |
| 09/26/2025 | Traffic control set-up approved between 9AM - 3:30PM |
| 10/01/2025 | Pre-Activity Meeting Pre- activity meeting to be held 72 hrs in advance of work start with inspections.. PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. |
Completed Inspections
Permit Status: Complete
Permit Number: TR-UTL-0925-01675
Permit Description: WO T160572. TEP will be removing 3 poles in R/W in (dirt) 3- 2'x2' holes 6' deep will be backfilled, no sidewalk impact.
11/26/25- 90 DAY RENEWAL AS OF 12/09/25. NEW EXPIRATION 03/09/26
Total Completed Inspections - 4
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 12/03/2025 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | Passed | ||
| 03/11/2026 | TRSP - ROW - Barricade - Setup/Routine | Passed | ||
| 03/11/2026 | TRSP - ROW - Backfill - Placement/Compaction | Passed | ||
| 03/11/2026 | TRSP - ROW - Final | Passed |