Permit Details

Status:
Complete
Type:
Right-of-Way (ROW) - Utility
Apply Date:
09/24/2025
Applicant:
John Rhodes
Description:
Tie point will be existing underground pedestal. Bore 150' of 2" conduit at a depth of 3'. run 150' of .625 coax. - In ROW Bore 300' of 2" conduit at a depth of 3'. run 300' of .625 coax.- on Private Property

Permit Reviews

Permit Number - TR-UTL-0925-01661
Permit Status: Complete
Permit Description: Tie point will be existing underground pedestal. Bore 150' of 2" conduit at a depth of 3'. run 150' of .625 coax. - In ROW Bore 300' of 2" conduit at a depth of 3'. run 300' of .625 coax.- on Private Property
Start Date Submittal Complete Date Status  
09/24/2025 RIGHT-OF-WAY REVIEW v.1 10/01/2025 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TR-UTL-0925-01661
Permit Status: Complete
Permit Description: Tie point will be existing underground pedestal. Bore 150' of 2" conduit at a depth of 3'. run 150' of .625 coax. - In ROW Bore 300' of 2" conduit at a depth of 3'. run 300' of .625 coax.- on Private Property
Total Outstanding Activity Conditions - 3
Date Name
09/25/2025 PAVEMENT MORATORIUM
09/25/2025 PRE-CON/PAVEMENT/SIDEWALK
09/25/2025 Traffic control set-up approved between 9AM - 3:30PM

Completed Inspections

Permit Status: Complete
Permit Number: TR-UTL-0925-01661
Permit Description: Tie point will be existing underground pedestal. Bore 150' of 2" conduit at a depth of 3'. run 150' of .625 coax. - In ROW Bore 300' of 2" conduit at a depth of 3'. run 300' of .625 coax.- on Private Property
Total Completed Inspections - 5
Date Description Inspector Results Comments
10/28/2025 TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting Passed
11/12/2025 TRSP - ROW - Barricade - Setup/Routine Passed
11/12/2025 TRSP - ROW - Barricade Takedown Passed
11/12/2025 TRSP - ROW - Backfill - Placement/Compaction Passed
11/12/2025 TRSP - ROW - Final Passed