Permit Details

Status:
Complete
Type:
Right-of-Way (ROW) - Utility
Address:
3902 E GRANT RD
Address NEW:
3902 E GRANT RD
Apply Date:
09/24/2025
Applicant:
Esteban Vega - Desert Barricades
Description:
WO T145047 - CITY OF TUCSON PI PROJECT - TEP working in ROW to install new conductor and set meter in contractor provided duct. TEP will remove existing conductor, pedestal and meter. TEP will be removing 1 pole in conflict with road project

Permit Reviews

Permit Number - TR-UTL-0925-01653
Permit Status: Complete
Permit Description: WO T145047 - CITY OF TUCSON PI PROJECT - TEP working in ROW to install new conductor and set meter in contractor provided duct. TEP will remove existing conductor, pedestal and meter. TEP will be removing 1 pole in conflict with road project
Start Date Submittal Complete Date Status  
09/24/2025 RIGHT-OF-WAY REVIEW v.1 10/02/2025 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TR-UTL-0925-01653
Permit Status: Complete
Permit Description: WO T145047 - CITY OF TUCSON PI PROJECT - TEP working in ROW to install new conductor and set meter in contractor provided duct. TEP will remove existing conductor, pedestal and meter. TEP will be removing 1 pole in conflict with road project
Total Outstanding Activity Conditions - 2
Date Name
09/25/2025 Traffic control set-up approved between 9AM - 3:30PM
09/25/2025 BUS STOP IN THE AREA, CONTACT SUN TRAN DISPATCH, AT 520-206-8934 AT LEAST 48-BUSINESS HOURS PRIOR TO START OF WORK FOR COORDINATION.

Completed Inspections

Permit Status: Complete
Permit Number: TR-UTL-0925-01653
Permit Description: WO T145047 - CITY OF TUCSON PI PROJECT - TEP working in ROW to install new conductor and set meter in contractor provided duct. TEP will remove existing conductor, pedestal and meter. TEP will be removing 1 pole in conflict with road project
Total Completed Inspections - 4
Date Description Inspector Results Comments
12/05/2025 TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting Passed
12/05/2025 TRSP - ROW - Barricade Takedown Passed
12/05/2025 TRSP - ROW - Backfill - Placement/Compaction Passed
12/05/2025 TRSP - ROW - Final Passed