Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit: TR-UTL-0925-01648
Permit Details
Status:
Complete
Type:
Right-of-Way (ROW) - Utility
Address:
1255 S SWAN RD
Address NEW:
1255 S SWAN RD
Apply Date:
09/23/2025
Applicant:
Quail Traffic
Description:
EXCAVATING 2 5X5 TRENCHES AT 1255 S SWAN RD AND 4690 E 22ND ST TO REPLACE GAS SERVICE BY RE-INSERTING IN ROW IN ASPHALT, CONCRETE AND DIRT.
Permit Reviews
Permit Number - TR-UTL-0925-01648
Permit Status: Complete
Permit Description: EXCAVATING 2 5X5 TRENCHES AT 1255 S SWAN RD AND 4690 E 22ND ST TO REPLACE GAS SERVICE BY RE-INSERTING IN ROW IN ASPHALT, CONCRETE AND DIRT.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 09/24/2025 | RIGHT-OF-WAY REVIEW v.1 | 09/30/2025 | REQUIRES RESUBMIT |
| 10/09/2025 | RIGHT-OF-WAY REVIEW v.2 | 10/09/2025 | APPROVED |
Outstanding Activity Conditions
Permit Number - TR-UTL-0925-01648
Permit Status: Complete
Permit Description: EXCAVATING 2 5X5 TRENCHES AT 1255 S SWAN RD AND 4690 E 22ND ST TO REPLACE GAS SERVICE BY RE-INSERTING IN ROW IN ASPHALT, CONCRETE AND DIRT.
Total Outstanding Activity Conditions - 7
| Date | Name |
|---|---|
| 09/25/2025 | Traffic control set-up approved between 9AM - 3:30PM |
| 09/25/2025 | Other Permits/Projects are or will be active in your project area. Please coordinate with the project manager in charge of any existing traffic control set-ups in your project area. |
| 09/25/2025 | BUS STOP IN THE AREA, CONTACT SUN TRAN DISPATCH, AT 520-206-8934 AT LEAST 48-BUSINESS HOURS PRIOR TO START OF WORK FOR COORDINATION. |
| 10/09/2025 | |
| 10/09/2025 | Bike Lane Access and Accommodation |
| 10/09/2025 | Pedestrian Access & Sidewalk |
| 10/09/2025 | Pre-Activity Meeting w/Inspections |
Completed Inspections
Permit Status: Complete
Permit Number: TR-UTL-0925-01648
Permit Description: EXCAVATING 2 5X5 TRENCHES AT 1255 S SWAN RD AND 4690 E 22ND ST TO REPLACE GAS SERVICE BY RE-INSERTING IN ROW IN ASPHALT, CONCRETE AND DIRT.
Total Completed Inspections - 4
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 11/13/2025 | TRSP - ROW - Paving - Subgrade/removal/placement | Passed | Work is complete, no impact to asphalt | |
| 11/13/2025 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | Passed | I met with contractor on-site before the permit was issued. Contractor began work within a week of the on-site meeting | |
| 11/13/2025 | TRSP - ROW - Barricade Takedown | Passed | Work is complete | |
| 11/13/2025 | TRSP - ROW - Final | Passed | Work is complete |