Permit Details

Status:
Complete
Type:
Right-of-Way (ROW) - Utility
Address NEW:
3985 N STONE AV BLDG A
Apply Date:
09/19/2025
Applicant:
Cox Communications
Description:
PRJ304053-1 Cox to proof and pull approx 20' of fiber through existing conduit and remove and replace 450' of aerial cable and system tie.

Permit Reviews

Permit Number - TR-UTL-0925-01615
Permit Status: Complete
Permit Description: PRJ304053-1 Cox to proof and pull approx 20' of fiber through existing conduit and remove and replace 450' of aerial cable and system tie.
Start Date Submittal Complete Date Status  
09/22/2025 RIGHT-OF-WAY REVIEW v.1 10/01/2025 REQUIRES RESUBMIT Review Details
10/03/2025 RIGHT-OF-WAY REVIEW v.2 10/06/2025 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TR-UTL-0925-01615
Permit Status: Complete
Permit Description: PRJ304053-1 Cox to proof and pull approx 20' of fiber through existing conduit and remove and replace 450' of aerial cable and system tie.
Total Outstanding Activity Conditions - 2
Date Name
09/23/2025 Traffic control set-up approved between 9AM - 3:30PM
09/23/2025 BUS STOP IN THE AREA, CONTACT SUN TRAN DISPATCH, AT 520-206-8934 AT LEAST 48-BUSINESS HOURS PRIOR TO START OF WORK FOR COORDINATION.

Completed Inspections

Permit Status: Complete
Permit Number: TR-UTL-0925-01615
Permit Description: PRJ304053-1 Cox to proof and pull approx 20' of fiber through existing conduit and remove and replace 450' of aerial cable and system tie.
Total Completed Inspections - 5
Date Description Inspector Results Comments
10/15/2025 TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting Passed
10/24/2025 TRSP - ROW - Barricade Takedown Passed
10/24/2025 TRSP - ROW - Backfill - Placement/Compaction Passed
10/24/2025 TRSP - ROW - AERIAL INSTALLATION Passed
01/06/2026 TRSP - ROW - Final Passed