Permit: TR-UTL-0925-01598
Permit Details
Status:
Complete
Type:
Right-of-Way (ROW) - Utility
Address:
2160 E BROADWAY BL
Address NEW:
2160 E BROADWAY BL
Apply Date:
09/18/2025
Applicant:
Ben Lozano / Border Traffic Safety LLC
Description:
Installing a 4" fire protection service and a 2" water service with 1.5" meter, 4-System Abandonments
Permit Reviews
Permit Number - TR-UTL-0925-01598
Permit Status: Complete
Permit Description: Installing a 4" fire protection service and a 2" water service with 1.5" meter, 4-System Abandonments
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 09/18/2025 | RIGHT-OF-WAY REVIEW v.1 | 09/23/2025 | APPROVED |
Outstanding Activity Conditions
Permit Number - TR-UTL-0925-01598
Permit Status: Complete
Permit Description: Installing a 4" fire protection service and a 2" water service with 1.5" meter, 4-System Abandonments
Total Outstanding Activity Conditions - 3
| Date | Name |
|---|---|
| 09/19/2025 | ** PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. ** PAVEMENT PATCH TYPE SHALL BE IN CONFORMANCE TO THE CURRENT EDITION OF THE CITY OF TUCSON PUBLIC UTILITY ADMINISTRTIVE MANUAL **SIDEWALK CLOSED AHEAD SIGNS SHALL BE PLACED AT THE NEAREST ADA ACCESS RAMPS PER MUTCD CHAPTER 6D. |
| 09/19/2025 | PAVEMENT MORATORIUM: ANY NEW ASPHALT THAT IS DISTURBED WILL REQUIRE A 2” MILL AND OVERLAY FOR 25’ IN EACH DIRECTION FROM THE OUTSIDE OF THE CUT FOR ALL EFFECTED TRAVEL LANES |
| 09/19/2025 | Traffic control set-up approved between 9AM - 3:30PM |
Completed Inspections
Permit Status: Complete
Permit Number: TR-UTL-0925-01598
Permit Description: Installing a 4" fire protection service and a 2" water service with 1.5" meter, 4-System Abandonments
Total Completed Inspections - 4
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/17/2025 | TRSP - ROW - Barricade - Setup/Routine | Passed | ||
| 10/16/2025 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | Passed | ||
| 10/17/2025 | TRSP - ROW - Backfill - Placement/Compaction | Passed | ||
| 10/31/2025 | TRSP - ROW - Final | Passed |