Permit: TR-UTL-0925-01594
Permit Details
Status:
Complete
Type:
Right-of-Way (ROW) - Utility
Address:
4319 S BELMAR AV
Address NEW:
4319 S BELMAR AV
Apply Date:
09/18/2025
Applicant:
ANGEL MORALES
Description:
P.169120A - KAHNA PLACE 3705' OF AERIAL FIBER CABLE AND TRENCH 15' TO PLACE 1 HH AND 1 FSAI
Permit Reviews
Permit Number - TR-UTL-0925-01594
Permit Status: Complete
Permit Description: P.169120A - KAHNA
PLACE 3705' OF AERIAL FIBER CABLE AND TRENCH 15' TO PLACE 1 HH AND 1 FSAI
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 09/18/2025 | RIGHT-OF-WAY REVIEW v.1 | 09/22/2025 | APPROVED |
Outstanding Activity Conditions
Permit Number - TR-UTL-0925-01594
Permit Status: Complete
Permit Description: P.169120A - KAHNA
PLACE 3705' OF AERIAL FIBER CABLE AND TRENCH 15' TO PLACE 1 HH AND 1 FSAI
Total Outstanding Activity Conditions - 5
| Date | Name |
|---|---|
| 09/19/2025 | Alley must be restored to existing or better condition. Alley surface must be graded and compacted to City Standards and Specifications for Public Improvements and existing drainage patterns must be restored and maintained. Any disturbed gravel must be replaced. |
| 09/19/2025 | Your project work requires that you contact City of Tucson Environmental Services Department (520-791-3171) at least 24 hours prior to closing any street or alley. |
| 09/19/2025 | Traffic Control set-up approved between 7AM - 5PM |
| 09/22/2025 | Pre-Activity Meeting Pre- activity meeting to be held 72 hrs in advance of work start with inspections.. PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. |
| 09/22/2025 | Other Permits/Projects are or will be active in your project area. Please coordinate with the project manager in charge of any existing traffic control set-ups in your project area. |
Completed Inspections
Permit Status: Complete
Permit Number: TR-UTL-0925-01594
Permit Description: P.169120A - KAHNA
PLACE 3705' OF AERIAL FIBER CABLE AND TRENCH 15' TO PLACE 1 HH AND 1 FSAI
Total Completed Inspections - 4
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/10/2025 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | Passed | ||
| 11/07/2025 | TRSP - ROW - SITE INSPECTION | Passed | ||
| 01/07/2026 | TRSP - ROW - AERIAL INSTALLATION | Passed | ||
| 01/07/2026 | TRSP - ROW - Final | Passed |