Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Details

Status:
Inspections
Type:
Right-of-Way (ROW) - Utility
Address:
2705 E MEDINA RD
Address NEW:
2705 E MEDINA RD
Apply Date:
09/17/2025
Applicant:
Robert Reynolds
Description:
5X5 BELL HOLE IN CONCRETE / ASPHALT TO REPLACE GAS LINE.

Permit Reviews

Permit Number - TR-UTL-0925-01585
Permit Status: Inspections
Permit Description: 5X5 BELL HOLE IN CONCRETE / ASPHALT TO REPLACE GAS LINE.
Start Date Submittal Complete Date Status  
09/17/2025 RIGHT-OF-WAY REVIEW v.1 09/17/2025 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TR-UTL-0925-01585
Permit Status: Inspections
Permit Description: 5X5 BELL HOLE IN CONCRETE / ASPHALT TO REPLACE GAS LINE.
Total Outstanding Activity Conditions - 4
Date Name
09/17/2025 Pre-Activity Meeting Pre- activity meeting to be held 72 hrs in advance of work start with inspections.. PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING.
09/17/2025 Private Property Driveways and private property shall NOT be utilized without the owner’s consent. It is the contractor’s responsibility to negotiate use of private property.
09/17/2025 Traffic Control set-up approved between 7AM - 5PM
09/17/2025 Other Permits/Projects are or will be active in your project area. Please coordinate with the project manager in charge of any existing traffic control set-ups in your project area.

Outstanding Inspections

Permit Status: Inspections
Permit Number: TR-UTL-0925-01585
Permite Description: 5X5 BELL HOLE IN CONCRETE / ASPHALT TO REPLACE GAS LINE.
Total Outstanding Inspections - 1
Last Inspection Date Description Inspector Results Comments
10/17/2025 TRSP - ROW - Final N/A Re-inspection required

Completed Inspections

Permit Status: Inspections
Permit Number: TR-UTL-0925-01585
Permit Description: 5X5 BELL HOLE IN CONCRETE / ASPHALT TO REPLACE GAS LINE.
Total Completed Inspections - 2
Date Description Inspector Results Comments
10/17/2025 TRSP - ROW - Barricade - Setup/Routine Passed
10/17/2025 TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting Passed

Documents

File Name Document Type  
COT - TR - ROW PERMIT.PDF DOCUMENTS VIEW
MEDINA_V1.PDF DOCUMENTS VIEW