Permit: TR-UTL-0925-01572
Permit Details
Status:
Complete
Type:
Right-of-Way (ROW) - Utility
Address:
3140 S PRUDENCE RD
Address NEW:
3140 S PRUDENCE RD
Apply Date:
09/15/2025
Applicant:
Judy Boyer
Description:
2 5x5 bell holes in blktop/dirt for crews to pothole gas line
Permit Reviews
Permit Number - TR-UTL-0925-01572
Permit Status: Complete
Permit Description: 2 5x5 bell holes in blktop/dirt for crews to pothole gas line
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 09/15/2025 | RIGHT-OF-WAY REVIEW v.1 | 09/15/2025 | APPROVED |
Outstanding Activity Conditions
Permit Number - TR-UTL-0925-01572
Permit Status: Complete
Permit Description: 2 5x5 bell holes in blktop/dirt for crews to pothole gas line
Total Outstanding Activity Conditions - 8
| Date | Name |
|---|---|
| 09/15/2025 | BUS STOP IN AREA, CONTACT SUN TRAN DISPTCH AT 520.206.8934 AT LEAST 48-BUSINESS HOURS PRIOR TO START OF WORK FOR COORDINATION. |
| 09/15/2025 | Your project work requires that you contact City of Tucson Environmental Services Department (520-791-3171) at least 24 hours prior to closing any street or alley. |
| 09/15/2025 | Bike Lane Access and Accommodation 1) Posted Speeds 30 Mph or Less – Less than 14 lane - Use of the R4-11 alone is acceptable and preferred over Share The Road sign - 2) Posted Speeds 30 Mph or less – greater than 14 lane - Use of Share The Road sign is preferred 3) Posted Speeds 30 Mph or More – Any Lane Size - Provide a reasonable alternative for cyclists, such as a paved path, space behind barricades, or bike detour. Acceptable to direct cyclists to the sidewalk when properly signed depending on conditions |
| 09/15/2025 | Pedestrian Access & Sidewalk PEDESTRIAN ACCESS MUST BE PROVIDED AND MAINTIANED PER MUTCD CHAPTER 6D. FIELD ADJUSTMENTS MAY BE REQUIRED. REPLACE/REPAIR SIDEWALK PANELS PER PAG STANDARD DETAIL 200\206 . PEDESTRIAN DETOUR ROUTE ON SAME SIDE OF RIGHT OF WAY TO BE PROVIDED IF NO MARKED ADA RAMPS AND CROSSING ACCESSABLE WITHIN 660' OF SIDEWALK CLOSURE. ACCESSABLE. Refer to MUTCD Chapter 6 Figure 6P-28, and 6K figure 6K-2. Refer to COT Utility manual Page 41 - 42 Refer to COT 2015 Addition to the MUTCD section 14 |
| 09/15/2025 | Pre-Activity Meeting Pre- activity meeting to be held 72 hrs in advance of work start with inspections.. PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. |
| 09/15/2025 | UNDER A PAVEMENT MORATORIUM, ANY NEW ASPHALT THAT IS DISTURBED WILL REQUIRE A 2” MILL AND OVERLAY FOR 25’ IN EACH DIRECTION FROM THE OUTSIDE OF THE CUT FOR ALL EFFECTED TRAVEL LANES. |
| 09/15/2025 | Traffic control set-up approved between 9AM - 3:30PM |
| 09/15/2025 | Other Permits/Projects are or will be active in your project area. Please coordinate with the project manager in charge of any existing traffic control set-ups in your project area. |
Completed Inspections
Permit Status: Complete
Permit Number: TR-UTL-0925-01572
Permit Description: 2 5x5 bell holes in blktop/dirt for crews to pothole gas line
Total Completed Inspections - 3
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 09/22/2025 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | Passed | Justin with Southwest Gas is well aware of the requirements and standards for the city of Tucson, I have had several pre-construction meetings with him in the past. Work will be performed in the dirt alleyway. | |
| 11/17/2025 | TRSP - ROW - Barricade - Setup/Routine | Passed | Work is complete | |
| 11/17/2025 | TRSP - ROW - Final | Passed | Work is complete |