Permit Details

Status:
Inspections
Type:
Right-of-Way (ROW) - Utility
Address NEW:
1135 W MIRACLE MILE
Apply Date:
09/10/2025
Applicant:
Esteban Vega - Desert Barricades
Description:
renew for 90 days as of 12/21/2025 new expiration date is 03/31/2026 WO T158546 - TEP to replace (1) pole in ROW; pole is between sidewalk and curb

Permit Reviews

Permit Number - TR-UTL-0925-01544
Permit Status: Inspections
Permit Description: renew for 90 days as of 12/21/2025 new expiration date is 03/31/2026 WO T158546 - TEP to replace (1) pole in ROW; pole is between sidewalk and curb
Start Date Submittal Complete Date Status  
09/12/2025 RIGHT-OF-WAY REVIEW v.2 09/12/2025 APPROVED Review Details
09/10/2025 RIGHT-OF-WAY REVIEW v.1 09/10/2025 REQUIRES RESUBMIT Review Details

Outstanding Activity Conditions

Permit Number - TR-UTL-0925-01544
Permit Status: Inspections
Permit Description: renew for 90 days as of 12/21/2025 new expiration date is 03/31/2026 WO T158546 - TEP to replace (1) pole in ROW; pole is between sidewalk and curb
Total Outstanding Activity Conditions - 6
Date Name
09/10/2025 Traffic control set-up approved between 9AM - 3:30PM
09/10/2025 A NOTICE OF TEMPORARY HOLIDAY RESTRICTION applies to this permit and will be in effect from Thanksgiving Day to January 02. Due to the increasing traffic volume on many of the City’s roads, it is necessary to restrict lane closures on certain roads during the holiday season.
09/12/2025 Bike Lane Access and Accommodation 1) Posted Speeds 30 Mph or Less – Less than 14 lane - Use of the R4-11 alone is acceptable and preferred over Share The Road sign - 2) Posted Speeds 30 Mph or less – greater than 14 lane - Use of Share The Road sign is preferred 3) Posted Speeds 30 Mph or More – Any Lane Size - Provide a reasonable alternative for cyclists, such as a paved path, space behind barricades, or bike detour. Acceptable to direct cyclists to the sidewalk when properly signed depending on conditions
09/12/2025 City of Tucson Right of Way Only ROW Permit is only allowed for work within City of Tucson Right of Way.
09/12/2025 PEDESTRIAN ACCESS MUST BE PROVIDED AND MAINTIANED PER MUTCD CHAPTER 6D. FIELD ADJUSTMENTS MAY BE REQUIRED. REPLACE/REPAIR SIDEWALK PANELS PER PAG STANDARD DETAIL 200\206 . PEDESTRIAN DETOUR ROUTE ON SAME SIDE OF RIGHT OF WAY TO BE PROVIDED IF NO MARKED ADA RAMPS AND CROSSING ACCESSABLE WITHIN 660' OF SIDEWALK CLOSURE. ACCESSABLE. Refer to MUTCD Chapter 6 Figure 6P-28, and 6K figure 6K-2. Refer to COT Utility manual Page 41 - 42 Refer to COT 2015 Addition to the MUTCD section 14
09/12/2025 Pre-Activity Meeting Pre- activity meeting to be held 72 hrs in advance of work start with inspections.. PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING

Outstanding Inspections

Permit Status: Inspections
Permit Number: TR-UTL-0925-01544
Permite Description: renew for 90 days as of 12/21/2025 new expiration date is 03/31/2026 WO T158546 - TEP to replace (1) pole in ROW; pole is between sidewalk and curb
Total Outstanding Inspections - 1
Last Inspection Date Description Inspector Results Comments
04/01/2026 TRSP - ROW - Final N/A Re-inspection required

Completed Inspections

Permit Status: Inspections
Permit Number: TR-UTL-0925-01544
Permit Description: renew for 90 days as of 12/21/2025 new expiration date is 03/31/2026 WO T158546 - TEP to replace (1) pole in ROW; pole is between sidewalk and curb
Total Completed Inspections - 4
Date Description Inspector Results Comments
11/21/2025 TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting Passed
03/17/2026 TRSP - ROW - Barricade - Setup/Routine Passed
03/20/2026 TRSP - ROW - Backfill - Placement/Compaction Passed permit has been extended to March 31. They are trying to get the sidewalk repaired this next week got extended by seven days but the worst case scenario they will have it done by the 30th. They are monitoring it daily as well as right away is monitoring it daily to make sure the cold patch does not sink and they maintain ADA specifications until permanent repair is done the sidewalk.
04/10/2026 TRSP - ROW - Final Passed All work completed restoration has been completed for this permit. Sidewalk panels have been replaced. Overhead work is done and splicing boxes have been put in place.

Documents

File Name Document Type  
COT - TR - ROW PERMIT.PDF DOCUMENTS VIEW
AERIAL MAP_V1.PDF DOCUMENTS VIEW
DB 71432 - 1135 W MIRACLE MILE - EB RLC - T158546_V1.PDF DOCUMENTS VIEW