Permit: TR-UTL-0925-01537
Permit Details
Status:
Complete
Type:
Right-of-Way (ROW) - Utility
Address:
1908 S COUNTRY CLUB RD
Address NEW:
1908 S COUNTRY CLUB RD
Apply Date:
09/09/2025
Applicant:
Esteban Vega - Desert Barricades
Description:
Renew for 90 days as of 12/14/2025 new expiration date is 03/14/2026 WO T50183 - Install (3) Poles, and approx. 700' of Overhead Conductor (3-477ACSR w/ 4/0 Neutral). (4) Locations with Overhead work Only. Install Secondary Riser & Pedestal Remove 300’ 3-#2ACSR w/ #2 Neutral
Permit Reviews
Permit Number - TR-UTL-0925-01537
Permit Status: Complete
Permit Description: Renew for 90 days as of 12/14/2025 new expiration date is 03/14/2026
WO T50183 - Install (3) Poles, and approx. 700' of Overhead Conductor (3-477ACSR w/ 4/0 Neutral).
(4) Locations with Overhead work Only. Install Secondary Riser & Pedestal
Remove 300’ 3-#2ACSR w/ #2 Neutral
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 09/09/2025 | RIGHT-OF-WAY REVIEW v.1 | 09/10/2025 | APPROVED |
Outstanding Activity Conditions
Permit Number - TR-UTL-0925-01537
Permit Status: Complete
Permit Description: Renew for 90 days as of 12/14/2025 new expiration date is 03/14/2026
WO T50183 - Install (3) Poles, and approx. 700' of Overhead Conductor (3-477ACSR w/ 4/0 Neutral).
(4) Locations with Overhead work Only. Install Secondary Riser & Pedestal
Remove 300’ 3-#2ACSR w/ #2 Neutral
Total Outstanding Activity Conditions - 7
| Date | Name |
|---|---|
| 09/10/2025 | Bike Lane Access and Accommodation 1) Posted Speeds 30 Mph or Less – Less than 14 lane - Use of the R4-11 alone is acceptable and preferred over Share The Road sign - 2) Posted Speeds 30 Mph or less – greater than 14 lane - Use of Share The Road sign is preferred 3) Posted Speeds 30 Mph or More – Any Lane Size - Provide a reasonable alternative for cyclists, such as a paved path, space behind barricades, or bike detour. Acceptable to direct cyclists to the sidewalk when properly signed depending on conditions |
| 09/10/2025 | BUS STOP IN THE AREA, CONTACT SUN TRAN DISPATCH, AT 520-206-8934 AT LEAST 48-BUSINESS HOURS PRIOR TO START OF WORK FOR COORDINATION. |
| 09/10/2025 | City of Tucson Right of Way Only ROW Permit is only allowed for work within City of Tucson Right of Way. |
| 09/10/2025 | ** PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. ** PAVEMENT PATCH TYPE SHALL BE IN CONFORMANCE TO THE CURRENT EDITION OF THE CITY OF TUCSON PUBLIC UTILITY ADMINISTRTIVE MANUAL **SIDEWALK CLOSED AHEAD SIGNS SHALL BE PLACED AT THE NEAREST ADA ACCESS RAMPS PER MUTCD CHAPTER 6D. |
| 09/10/2025 | Traffic control set-up approved between 9AM - 3:30PM |
| 09/10/2025 | Pedestrian Access & Sidewalk PEDESTRIAN ACCESS MUST BE PROVIDED AND MAINTIANED PER MUTCD CHAPTER 6D. FIELD ADJUSTMENTS MAY BE REQUIRED. REPLACE/REPAIR SIDEWALK PANELS PER PAG STANDARD DETAIL 200\206 . PEDESTRIAN DETOUR ROUTE ON SAME SIDE OF RIGHT OF WAY TO BE PROVIDED IF NO MARKED ADA RAMPS AND CROSSING ACCESSABLE WITHIN 660' OF SIDEWALK CLOSURE. ACCESSABLE. Refer to MUTCD Chapter 6 Figure 6P-28, and 6K figure 6K-2. Refer to COT Utility manual Page 41 - 42 Refer to COT 2015 Addition to the MUTCD section 14 |
| 09/10/2025 | Private Property Driveways and private property shall NOT be utilized without the owner’s consent. It is the contractor’s responsibility to negotiate use of private property. |
Outstanding Inspections
Permit Status: Complete
Permit Number: TR-UTL-0925-01537
Permite Description: Renew for 90 days as of 12/14/2025 new expiration date is 03/14/2026
WO T50183 - Install (3) Poles, and approx. 700' of Overhead Conductor (3-477ACSR w/ 4/0 Neutral).
(4) Locations with Overhead work Only. Install Secondary Riser & Pedestal
Remove 300’ 3-#2ACSR w/ #2 Neutral
Total Outstanding Inspections - 3
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 12/15/2025 | TRSP - ROW - Barricade - Setup/Routine | N/A | Re-inspection required | This permit has been renewed until 14 March 2026. Work has not started on this permit yet. |
| 12/15/2025 | TRSP - ROW - Backfill - Placement/Compaction | N/A | Re-inspection required | This permit has been renewed until 14 March 2026. Work has not started on this permit yet. |
| 12/15/2025 | TRSP - ROW - Final | N/A | Re-inspection required | This permit has been renewed until 14 March 2026. Work has not started on this permit yet. |
Completed Inspections
Permit Status: Complete
Permit Number: TR-UTL-0925-01537
Permit Description: Renew for 90 days as of 12/14/2025 new expiration date is 03/14/2026
WO T50183 - Install (3) Poles, and approx. 700' of Overhead Conductor (3-477ACSR w/ 4/0 Neutral).
(4) Locations with Overhead work Only. Install Secondary Riser & Pedestal
Remove 300’ 3-#2ACSR w/ #2 Neutral
Total Completed Inspections - 4
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 12/15/2025 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | Passed | This permit has been renewed until 14 March 2026. Work has not started on this permit yet. | |
| 03/16/2026 | TRSP - ROW - Barricade - Setup/Routine | Passed | Work is complete | |
| 03/16/2026 | TRSP - ROW - Backfill - Placement/Compaction | Passed | Work is complete | |
| 03/16/2026 | TRSP - ROW - Final | Passed | Work is complete |