Permit: TR-UTL-0925-01516
Permit Details
Status:
Complete
Type:
Right-of-Way (ROW) - Utility
Address:
5236 S MISSIONDALE RD
Address NEW:
5236 S MISSIONDALE RD
Apply Date:
09/05/2025
Applicant:
Chelsey Bolinger
Description:
P.169108 (KAHNA) - BORE 1,408’ & TRENCH 107’ TO PLACE CTL CONDUIT & FIBER CABLE. PLACE (1) FSAI CABINET, (16) HANDHOLES & PEDESTALS. OVERLASH 3,610’ OF AERIAL FIBER CABLE.
Permit Reviews
Permit Number - TR-UTL-0925-01516
Permit Status: Complete
Permit Description: P.169108 (KAHNA) - BORE 1,408’ & TRENCH 107’ TO PLACE CTL CONDUIT & FIBER CABLE. PLACE (1) FSAI CABINET, (16) HANDHOLES & PEDESTALS. OVERLASH 3,610’ OF AERIAL FIBER CABLE.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 09/05/2025 | RIGHT-OF-WAY REVIEW v.1 | 09/10/2025 | APPROVED |
Outstanding Activity Conditions
Permit Number - TR-UTL-0925-01516
Permit Status: Complete
Permit Description: P.169108 (KAHNA) - BORE 1,408’ & TRENCH 107’ TO PLACE CTL CONDUIT & FIBER CABLE. PLACE (1) FSAI CABINET, (16) HANDHOLES & PEDESTALS. OVERLASH 3,610’ OF AERIAL FIBER CABLE.
Total Outstanding Activity Conditions - 5
| Date | Name |
|---|---|
| 09/09/2025 | ALLEY |
| 09/09/2025 | LOCAL street Pavement Moratorium |
| 09/09/2025 | PRE-CON/PAVEMENT/SIDEWALK |
| 09/09/2025 | Traffic Control set-up approved between 7AM - 5PM |
| 09/09/2025 | Other Permits/Projects are or will be active in your project area. Please coordinate with the project manager in charge of any existing traffic control set-ups in your project area. |
Completed Inspections
Permit Status: Complete
Permit Number: TR-UTL-0925-01516
Permit Description: P.169108 (KAHNA) - BORE 1,408’ & TRENCH 107’ TO PLACE CTL CONDUIT & FIBER CABLE. PLACE (1) FSAI CABINET, (16) HANDHOLES & PEDESTALS. OVERLASH 3,610’ OF AERIAL FIBER CABLE.
Total Completed Inspections - 5
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/14/2025 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | Passed | ||
| 12/23/2025 | TRSP - ROW - Barricade - Setup/Routine | Passed | ||
| 12/23/2025 | TRSP - ROW - Barricade Takedown | Passed | ||
| 12/23/2025 | TRSP - ROW - Backfill - Placement/Compaction | Passed | ||
| 12/23/2025 | TRSP - ROW - Final | Passed |