Permit: TR-UTL-0925-01509
Permit Details
Status:
Inspections
Type:
Right-of-Way (ROW) - Utility
Address:
1708 N NAVAJO ST
Address NEW:
1708 N NAVAJO ST
Apply Date:
09/05/2025
Applicant:
ELIU MELGOZA
Description:
P.175048.E.01- Transfer CenturyLink services from old utility pole to new foreign pole already in place.
Permit Reviews
Permit Number - TR-UTL-0925-01509
Permit Status: Inspections
Permit Description: P.175048.E.01- Transfer CenturyLink services from old utility pole to new foreign pole already in place.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 09/05/2025 | RIGHT-OF-WAY REVIEW v.1 | 09/09/2025 | APPROVED |
Outstanding Activity Conditions
Permit Number - TR-UTL-0925-01509
Permit Status: Inspections
Permit Description: P.175048.E.01- Transfer CenturyLink services from old utility pole to new foreign pole already in place.
Total Outstanding Activity Conditions - 4
| Date | Name |
|---|---|
| 09/08/2025 | Pre-Activity Meeting Pre- activity meeting to be held 72 hrs in advance of work start with inspections.. PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. |
| 09/08/2025 | Private Property Driveways and private property shall NOT be utilized without the owner’s consent. It is the contractor’s responsibility to negotiate use of private property. |
| 09/08/2025 | UNDER A PAVEMENT MORATORIUM, ANY NEW ASPHALT THAT IS DISTURBED WILL REQUIRE A 2” MILL AND OVERLAY FOR 25’ IN EACH DIRECTION FROM THE OUTSIDE OF THE CUT FOR ALL EFFECTED TRAVEL LANES. |
| 09/08/2025 | Traffic Control set-up approved between 7AM - 5PM |
Outstanding Inspections
Permit Status: Inspections
Permit Number: TR-UTL-0925-01509
Permite Description: P.175048.E.01- Transfer CenturyLink services from old utility pole to new foreign pole already in place.
Total Outstanding Inspections - 3
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/22/2025 | TRSP - ROW - Barricade - Setup/Routine | N/A | Re-inspection required | |
| 10/22/2025 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | N/A | Re-inspection required | |
| 10/22/2025 | TRSP - ROW - Final | N/A | Re-inspection required |