Permit: TR-UTL-0925-01506
Permit Details
Status:
Complete
Type:
Right-of-Way (ROW) - Utility
Address:
1113 W GRANT RD
Address NEW:
1113 W GRANT RD
Apply Date:
09/05/2025
Applicant:
ANGEL MORALES
Description:
Performing a tie in into the existing Tucson water waterline at the intersection on flowing wells and grant road. Length will be approx. 20 feet long. 5-10 feet wide and a depth of 5-8 ft. 24HR *** Continuation permit TR-UTL-0725-01228.
Permit Reviews
Permit Number - TR-UTL-0925-01506
Permit Status: Complete
Permit Description: Performing a tie in into the existing Tucson water waterline at the intersection on flowing wells and grant road. Length will be approx. 20 feet long. 5-10 feet wide and a depth of 5-8 ft.
24HR ***
Continuation permit TR-UTL-0725-01228.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 09/05/2025 | RIGHT-OF-WAY REVIEW v.1 | 09/30/2025 | APPROVED |
Outstanding Activity Conditions
Permit Number - TR-UTL-0925-01506
Permit Status: Complete
Permit Description: Performing a tie in into the existing Tucson water waterline at the intersection on flowing wells and grant road. Length will be approx. 20 feet long. 5-10 feet wide and a depth of 5-8 ft.
24HR ***
Continuation permit TR-UTL-0725-01228.
Total Outstanding Activity Conditions - 3
| Date | Name |
|---|---|
| 09/08/2025 | ROW Permit is only allowed for work within City of Tucson Right of Way. |
| 09/08/2025 | The following extended traffic control set-up times were approved: |
| 09/08/2025 | BUS STOP IN THE AREA, CONTACT SUN TRAN DISPATCH, AT 520-206-8934 AT LEAST 48-BUSINESS HOURS PRIOR TO START OF WORK FOR COORDINATION. |
Completed Inspections
Permit Status: Complete
Permit Number: TR-UTL-0925-01506
Permit Description: Performing a tie in into the existing Tucson water waterline at the intersection on flowing wells and grant road. Length will be approx. 20 feet long. 5-10 feet wide and a depth of 5-8 ft.
24HR ***
Continuation permit TR-UTL-0725-01228.
Total Completed Inspections - 3
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/15/2025 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | Passed | ||
| 12/29/2025 | TRSP - ROW - Paving - Subgrade/removal/placement | Passed | ||
| 12/29/2025 | TRSP - ROW - Final | Passed |