Permit Details

Status:
Complete
Type:
Right-of-Way (ROW) - Utility
Address NEW:
1018 W SAINT MARYS RD
Apply Date:
09/03/2025
Applicant:
Quail Traffic
Description:
EXCAVATING A 5X3 TRENCH AT 1018, 1016 AND 1014 TO REPLACE AND ABANDON GAS SERVICES IN ROW IN ASPHALT AND DIRT. PLEASE SEE SITE PLAN FOR LOCATIONS. PREVIOUS PERMIT TR-UTL-0225-00359 FOR THIS JOB WAS NOT USED DUE TO BUDGET CUTS. WE HAD RECEIVED A WAIVER FOR THE ARCHAEOLOGICAL MONITORING. I WILL ATTACH IT TO THIS PERMIT

Permit Reviews

Permit Number - TR-UTL-0925-01491
Permit Status: Complete
Permit Description: EXCAVATING A 5X3 TRENCH AT 1018, 1016 AND 1014 TO REPLACE AND ABANDON GAS SERVICES IN ROW IN ASPHALT AND DIRT. PLEASE SEE SITE PLAN FOR LOCATIONS. PREVIOUS PERMIT TR-UTL-0225-00359 FOR THIS JOB WAS NOT USED DUE TO BUDGET CUTS. WE HAD RECEIVED A WAIVER FOR THE ARCHAEOLOGICAL MONITORING. I WILL ATTACH IT TO THIS PERMIT
Start Date Submittal Complete Date Status  
09/22/2025 RIGHT-OF-WAY REVIEW v.2 09/23/2025 APPROVED Review Details
09/04/2025 RIGHT-OF-WAY REVIEW v.1 09/15/2025 REQUIRES RESUBMIT Review Details

Outstanding Activity Conditions

Permit Number - TR-UTL-0925-01491
Permit Status: Complete
Permit Description: EXCAVATING A 5X3 TRENCH AT 1018, 1016 AND 1014 TO REPLACE AND ABANDON GAS SERVICES IN ROW IN ASPHALT AND DIRT. PLEASE SEE SITE PLAN FOR LOCATIONS. PREVIOUS PERMIT TR-UTL-0225-00359 FOR THIS JOB WAS NOT USED DUE TO BUDGET CUTS. WE HAD RECEIVED A WAIVER FOR THE ARCHAEOLOGICAL MONITORING. I WILL ATTACH IT TO THIS PERMIT
Total Outstanding Activity Conditions - 5
Date Name
09/04/2025 ** PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. ** PAVEMENT PATCH TYPE SHALL BE IN CONFORMANCE TO THE CURRENT EDITION OF THE CITY OF TUCSON PUBLIC UTILITY ADMINISTRTIVE MANUAL **SIDEWALK CLOSED AHEAD SIGNS SHALL BE PLACED AT THE NEAREST ADA ACCESS RAMPS PER MUTCD CHAPTER 6D.
09/04/2025 Traffic control set-up approved between 9AM - 3:30PM
09/23/2025 The following extended traffic control set-up times were approved: Pedestrian Detour Route 24 hrs closures
09/23/2025
09/23/2025 Other Permits/Projects are or will be active in your project area. Please coordinate with the project manager in charge of any existing traffic control set-ups in your project area.

Conditions

Permit Number - TR-UTL-0925-01491
Permit Status: Complete
Permit Description: EXCAVATING A 5X3 TRENCH AT 1018, 1016 AND 1014 TO REPLACE AND ABANDON GAS SERVICES IN ROW IN ASPHALT AND DIRT. PLEASE SEE SITE PLAN FOR LOCATIONS. PREVIOUS PERMIT TR-UTL-0225-00359 FOR THIS JOB WAS NOT USED DUE TO BUDGET CUTS. WE HAD RECEIVED A WAIVER FOR THE ARCHAEOLOGICAL MONITORING. I WILL ATTACH IT TO THIS PERMIT
Date Description Comments
09/04/2025 This project is located in an Archaeological Sensitivity Zone. An Archaeological Monitor hired by the permit applicant is required to be on-site during any digging, unless a waiver is issued. Monitoring reports are to be submitted to Historic Preservation Office, City of Tucson, P.O. Box 27210, Tucson, AZ 85726.** Please contact Historic Preservation Office at PDSDHistoric@tucsonaz.gov.

Outstanding Inspections

Permit Status: Complete
Permit Number: TR-UTL-0925-01491
Permite Description: EXCAVATING A 5X3 TRENCH AT 1018, 1016 AND 1014 TO REPLACE AND ABANDON GAS SERVICES IN ROW IN ASPHALT AND DIRT. PLEASE SEE SITE PLAN FOR LOCATIONS. PREVIOUS PERMIT TR-UTL-0225-00359 FOR THIS JOB WAS NOT USED DUE TO BUDGET CUTS. WE HAD RECEIVED A WAIVER FOR THE ARCHAEOLOGICAL MONITORING. I WILL ATTACH IT TO THIS PERMIT
Total Outstanding Inspections - 1
Last Inspection Date Description Inspector Results Comments
10/31/2025 TRSP - ROW - Final N/A Re-inspection required

Completed Inspections

Permit Status: Complete
Permit Number: TR-UTL-0925-01491
Permit Description: EXCAVATING A 5X3 TRENCH AT 1018, 1016 AND 1014 TO REPLACE AND ABANDON GAS SERVICES IN ROW IN ASPHALT AND DIRT. PLEASE SEE SITE PLAN FOR LOCATIONS. PREVIOUS PERMIT TR-UTL-0225-00359 FOR THIS JOB WAS NOT USED DUE TO BUDGET CUTS. WE HAD RECEIVED A WAIVER FOR THE ARCHAEOLOGICAL MONITORING. I WILL ATTACH IT TO THIS PERMIT
Total Completed Inspections - 4
Date Description Inspector Results Comments
10/23/2025 TRSP - ROW - Barricade - Setup/Routine Passed
10/23/2025 TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting Passed
10/24/2025 TRSP - ROW - Backfill - Placement/Compaction Passed
07/29/2026 TRSP - ROW - Final Passed Yes all permit permanent patch has been installed prior to the RTA and the 411 should be done within the next year and a half

Documents

File Name Document Type  
COT - TR - ROW PERMIT.PDF DOCUMENTS VIEW
1018 W SAINT MARY'S_V1.PDF DOCUMENTS VIEW
HHC - 1018 W ST MARYS RD - RIGHT LANE CLOSURE - 25-054 HHC3041 REVISED_V2.PDF DOCUMENTS VIEW