Permit: TR-UTL-0925-01476
Permit Details
Status:
Complete
Type:
Right-of-Way (ROW) - Utility
Address:
4955 E 2ND ST
Address NEW:
4955 E 2ND ST
Apply Date:
09/02/2025
Applicant:
Kristine Schwartz
Description:
2 5x5 bellholes in dirt/blktop front for crews to repair gas leak
Permit Reviews
Permit Number - TR-UTL-0925-01476
Permit Status: Complete
Permit Description: 2 5x5 bellholes in dirt/blktop front for crews to repair gas leak
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 09/02/2025 | RIGHT-OF-WAY REVIEW v.1 | 09/03/2025 | APPROVED |
Outstanding Activity Conditions
Permit Number - TR-UTL-0925-01476
Permit Status: Complete
Permit Description: 2 5x5 bellholes in dirt/blktop front for crews to repair gas leak
Total Outstanding Activity Conditions - 5
| Date | Name |
|---|---|
| 09/02/2025 | Pre-Activity Meeting |
| 09/02/2025 | Private Property |
| 09/02/2025 | IS UNDER A PAVEMENT MORATORIUM, ANY NEW ASPHALT THAT IS DISTURBED WILL REQUIRE A 2” MILL AND OVERLAY FOR 25’ IN EACH DIRECTION FROM THE OUTSIDE OF THE CUT FOR ALL EFFECTED TRAVEL LANES. |
| 09/02/2025 | Traffic Control set-up approved between 7AM - 5PM |
| 09/02/2025 | Other Permits/Projects are or will be active in your project area. Please coordinate with the project manager in charge of any existing traffic control set-ups in your project area. |
Completed Inspections
Permit Status: Complete
Permit Number: TR-UTL-0925-01476
Permit Description: 2 5x5 bellholes in dirt/blktop front for crews to repair gas leak
Total Completed Inspections - 3
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 09/05/2025 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | Passed | ||
| 12/17/2025 | TRSP - ROW - Backfill - Placement/Compaction | Passed | ||
| 12/17/2025 | TRSP - ROW - Final | Passed |