Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit Details

Status:
Complete
Type:
Right-of-Way (ROW) - Utility
Address NEW:
4875 S ALBACETE AV
Apply Date:
09/01/2025
Applicant:
Chelsey Bolinger
Description:
P.169111B (KAHNA) - BORE 2,501 ' TO PLACE CTL CONDUIT & FIBER CABLE. PLACE (1) FSAI CABINET, (1) HANDHOLE, (12) PEDESTALS.

Permit Reviews

Permit Number - TR-UTL-0925-01475
Permit Status: Complete
Permit Description: P.169111B (KAHNA) - BORE 2,501 ' TO PLACE CTL CONDUIT & FIBER CABLE. PLACE (1) FSAI CABINET, (1) HANDHOLE, (12) PEDESTALS.
Start Date Submittal Complete Date Status  
09/02/2025 RIGHT-OF-WAY REVIEW v.1 09/09/2025 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TR-UTL-0925-01475
Permit Status: Complete
Permit Description: P.169111B (KAHNA) - BORE 2,501 ' TO PLACE CTL CONDUIT & FIBER CABLE. PLACE (1) FSAI CABINET, (1) HANDHOLE, (12) PEDESTALS.
Total Outstanding Activity Conditions - 5
Date Name
09/02/2025 This project is located in an Archaeological Sensitivity Zone. An Archaeological Monitor hired by the permit applicant is required to be on-site during any digging, unless a waiver is issued. Monitoring reports are to be submitted to Historic Preservation Office, City of Tucson, P.O. Box 27210, Tucson, AZ 85726.** Please contact Historic Preservation Office at PDSDHistoric@tucsonaz.gov.
09/02/2025 ** PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. ** PAVEMENT PATCH TYPE SHALL BE IN CONFORMANCE TO THE CURRENT EDITION OF THE CITY OF TUCSON PUBLIC UTILITY ADMINISTRTIVE MANUAL **SIDEWALK CLOSED AHEAD SIGNS SHALL BE PLACED AT THE NEAREST ADA ACCESS RAMPS PER MUTCD CHAPTER 6D.
09/02/2025 Traffic Control set-up approved between 7AM - 5PM
09/03/2025 City of Tucson Right of Way Only
09/03/2025 Private Property

Completed Inspections

Permit Status: Complete
Permit Number: TR-UTL-0925-01475
Permit Description: P.169111B (KAHNA) - BORE 2,501 ' TO PLACE CTL CONDUIT & FIBER CABLE. PLACE (1) FSAI CABINET, (1) HANDHOLE, (12) PEDESTALS.
Total Completed Inspections - 4
Date Description Inspector Results Comments
12/22/2025 TRSP - ROW - Barricade - Setup/Routine Passed
12/22/2025 TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting Passed
12/22/2025 TRSP - ROW - Backfill - Placement/Compaction Passed
12/22/2025 TRSP - ROW - Final Passed

Documents

File Name Document Type  
COT - TR - ROW PERMIT.PDF DOCUMENTS VIEW
P.169111B_ AERIAL MAP_V1.PDF DOCUMENTS VIEW
P.169111B_CAD_09012025_V1.PDF DOCUMENTS VIEW
P.169111B_TCP_09012025_V1.PDF DOCUMENTS VIEW