Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit: TR-UTL-0925-01472
Permit Details
Status:
Inspections
Type:
Right-of-Way (ROW) - Utility
Address:
1601 N SWAN RD
Address NEW:
1601 N SWAN RD
Apply Date:
09/01/2025
Applicant:
Chelsey Bolinger
Description:
P.099106A (KAHNA) - BORE 532' & TRENCH 63’ TO PLACE CTL CONDUIT & FIBER CABLE. PLACE (1) FSAI CABINET, (2) HANDHOLES. OVERLASH 3,318' AERIAL CABLE.
Permit Reviews
Permit Number - TR-UTL-0925-01472
Permit Status: Inspections
Permit Description: P.099106A (KAHNA) - BORE 532' & TRENCH 63’ TO PLACE CTL CONDUIT & FIBER CABLE. PLACE (1) FSAI CABINET, (2) HANDHOLES. OVERLASH 3,318' AERIAL CABLE.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 09/02/2025 | RIGHT-OF-WAY REVIEW v.1 | 09/03/2025 | APPROVED |
Outstanding Activity Conditions
Permit Number - TR-UTL-0925-01472
Permit Status: Inspections
Permit Description: P.099106A (KAHNA) - BORE 532' & TRENCH 63’ TO PLACE CTL CONDUIT & FIBER CABLE. PLACE (1) FSAI CABINET, (2) HANDHOLES. OVERLASH 3,318' AERIAL CABLE.
Total Outstanding Activity Conditions - 5
| Date | Name |
|---|---|
| 09/02/2025 | LOCAL street Pavement Moratorium: |
| 09/02/2025 | PRE-CON/PAVEMENT/SIDEWALK |
| 09/02/2025 | Traffic Control set-up approved between 7AM - 5PM |
| 09/02/2025 | Traffic control set-up approved between 9AM - 3:30PM |
| 09/02/2025 | Other Permits/Projects are or will be active in your project area. Please coordinate with the project manager in charge of any existing traffic control set-ups in your project area. |
Completed Inspections
Permit Status: Inspections
Permit Number: TR-UTL-0925-01472
Permit Description: P.099106A (KAHNA) - BORE 532' & TRENCH 63’ TO PLACE CTL CONDUIT & FIBER CABLE. PLACE (1) FSAI CABINET, (2) HANDHOLES. OVERLASH 3,318' AERIAL CABLE.
Total Completed Inspections - 1
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 09/17/2025 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | Passed |