Permit: TR-UTL-0924-01837
Permit Details
Status:
Complete
Type:
Right-of-Way (ROW) - Utility
Address:
2414 E 23RD ST
Address NEW:
2414 E 23RD ST
Apply Date:
09/23/2024
Applicant:
Description:
wo2883499 2414 e 23rd st 14-14-20 nw service renewal in dirt and asphalt in front of property 6lf/ar
Permit Reviews
Permit Number - TR-UTL-0924-01837
Permit Status: Complete
Permit Description: wo2883499 2414 e 23rd st 14-14-20 nw service renewal in dirt and asphalt in front of property 6lf/ar
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 09/24/2024 | RIGHT-OF-WAY REVIEW v.1 | 09/26/2024 | APPROVED |
Outstanding Activity Conditions
Permit Number - TR-UTL-0924-01837
Permit Status: Complete
Permit Description: wo2883499 2414 e 23rd st 14-14-20 nw service renewal in dirt and asphalt in front of property 6lf/ar
Total Outstanding Activity Conditions - 2
| Date | Name |
|---|---|
| 09/26/2024 | Traffic Control set-up approved between 7AM - 5PM |
| 09/26/2024 | Pavement Patch type Shall Be in conformance to the current edition of the City of Tucson Public Utility Administrative Manual. |
Outstanding Inspections
Permit Status: Complete
Permit Number: TR-UTL-0924-01837
Permite Description: wo2883499 2414 e 23rd st 14-14-20 nw service renewal in dirt and asphalt in front of property 6lf/ar
Total Outstanding Inspections - 3
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/24/2024 | TRSP - ROW - Paving - Subgrade/removal/placement | N/A | Re-inspection required | temporary patch in place, permanent patch required |
| 10/24/2024 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | N/A | Re-inspection required | no pre con meeting held |
| 10/24/2024 | TRSP - ROW - Final | N/A | Re-inspection required | remove barricade and replace temporary patch with permanent patch |
Completed Inspections
Permit Status: Complete
Permit Number: TR-UTL-0924-01837
Permit Description: wo2883499 2414 e 23rd st 14-14-20 nw service renewal in dirt and asphalt in front of property 6lf/ar
Total Completed Inspections - 3
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 02/25/2026 | TRSP - ROW - Paving - Subgrade/removal/placement | Passed | ||
| 02/25/2026 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | Passed | ||
| 02/25/2026 | TRSP - ROW - Final | Passed |