Permit: TR-UTL-0924-01789
Permit Details
Status:
Complete
Type:
Right-of-Way (ROW) - Utility
Address:
4810 E 1ST ST
Address NEW:
4810 E 1ST ST
Apply Date:
09/18/2024
Applicant:
Sarah Latimer
Description:
EXCAVATING A 5X5 TRENCH AT 4810 E 1ST ST TO REPLACE GAS SERVICE IN ROW IN ASPHALT AND DIRT. TRENCH WILL BE LOCATED APPROX 45' NORTH OF NORTH P/L AND 17' EAST OF WEST P/L. WE WILL BE INSERTING THROUGH EXISTING SLEEVING ACROSS STREET.
Permit Reviews
Permit Number - TR-UTL-0924-01789
Permit Status: Complete
Permit Description: EXCAVATING A 5X5 TRENCH AT 4810 E 1ST ST TO REPLACE GAS SERVICE IN ROW IN ASPHALT AND DIRT. TRENCH WILL BE LOCATED APPROX 45' NORTH OF NORTH P/L AND 17' EAST OF WEST P/L. WE WILL BE INSERTING THROUGH EXISTING SLEEVING ACROSS STREET.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 09/18/2024 | RIGHT-OF-WAY REVIEW v.1 | 09/19/2024 | APPROVED |
Outstanding Activity Conditions
Permit Number - TR-UTL-0924-01789
Permit Status: Complete
Permit Description: EXCAVATING A 5X5 TRENCH AT 4810 E 1ST ST TO REPLACE GAS SERVICE IN ROW IN ASPHALT AND DIRT. TRENCH WILL BE LOCATED APPROX 45' NORTH OF NORTH P/L AND 17' EAST OF WEST P/L. WE WILL BE INSERTING THROUGH EXISTING SLEEVING ACROSS STREET.
Total Outstanding Activity Conditions - 2
| Date | Name |
|---|---|
| 09/19/2024 | ** PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. ** PAVEMENT PATCH TYPE SHALL BE IN CONFORMANCE TO THE CURRENT EDITION OF THE CITY OF TUCSON PUBLIC UTILITY ADMINISTRTIVE MANUAL **SIDEWALK CLOSED AHEAD SIGNS SHALL BE PLACED AT THE NEAREST ADA ACCESS RAMPS PER MUTCD CHAPTER 6D. |
| 09/19/2024 | Traffic Control set-up approved between 7AM - 5PM |
Completed Inspections
Permit Status: Complete
Permit Number: TR-UTL-0924-01789
Permit Description: EXCAVATING A 5X5 TRENCH AT 4810 E 1ST ST TO REPLACE GAS SERVICE IN ROW IN ASPHALT AND DIRT. TRENCH WILL BE LOCATED APPROX 45' NORTH OF NORTH P/L AND 17' EAST OF WEST P/L. WE WILL BE INSERTING THROUGH EXISTING SLEEVING ACROSS STREET.
Total Completed Inspections - 4
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/07/2024 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | Passed | ||
| 10/23/2024 | TRSP - ROW - Backfill - Placement/Compaction | Passed | ||
| 07/08/2025 | TRSP - ROW - Barricade - Setup/Routine | Passed | ||
| 07/08/2025 | TRSP - ROW - Final | Passed |