Permit: TR-UTL-0924-01783
Permit Details
Status:
Complete
Type:
Right-of-Way (ROW) - Utility
Address:
102 W ELVIRA RD
Address NEW:
102 W ELVIRA RD
Apply Date:
09/17/2024
Applicant:
Andrew Ruiz
Description:
Reconstructing a sewer manhole; it will be a trench of 8x8.*** ( Comment response Note: Work will replace Barrels and Bases at each location to return manholes to Pima County Standards, work to begin 9/30/24 and take 1 week to complete.. Pavement Pave Back will be corrdinated through COT Project Manager Nicholas Germanos at the conclusion of work)
Permit Reviews
Permit Number - TR-UTL-0924-01783
Permit Status: Complete
Permit Description: Reconstructing a sewer manhole; it will be a trench of 8x8.*** ( Comment response Note: Work will replace Barrels and Bases at each location to return manholes to Pima County Standards, work to begin 9/30/24 and take 1 week to complete.. Pavement Pave Back will be corrdinated through COT Project Manager Nicholas Germanos at the conclusion of work)
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 09/23/2024 | RIGHT-OF-WAY REVIEW v.2 | 09/24/2024 | APPROVED |
| 09/17/2024 | RIGHT-OF-WAY REVIEW v.1 | 09/20/2024 | REQUIRES RESUBMIT |
Outstanding Activity Conditions
Permit Number - TR-UTL-0924-01783
Permit Status: Complete
Permit Description: Reconstructing a sewer manhole; it will be a trench of 8x8.*** ( Comment response Note: Work will replace Barrels and Bases at each location to return manholes to Pima County Standards, work to begin 9/30/24 and take 1 week to complete.. Pavement Pave Back will be corrdinated through COT Project Manager Nicholas Germanos at the conclusion of work)
Total Outstanding Activity Conditions - 4
| Date | Name |
|---|---|
| 09/19/2024 | Alley must be restored to existing or better condition. Alley surface must be graded and compacted to City Standards and Specifications for Public Improvements and existing drainage patterns must be restored and maintained. Any disturbed gravel must be replaced. |
| 09/19/2024 | Your project work requires that you contact City of Tucson Environmental Services Department (520-791-3171) at least 24 hours prior to closing any street or alley. |
| 09/19/2024 | Traffic Control set-up approved between 7AM - 5PM |
| 09/24/2024 | Pavement in proposed work area is under pavement moratorium beginning March 2024.. Pavement will need to be restored to City of Tucson Standard Detail #218 M-2021-004 Exhibit C Sheet 1 of 1 |
Completed Inspections
Permit Status: Complete
Permit Number: TR-UTL-0924-01783
Permit Description: Reconstructing a sewer manhole; it will be a trench of 8x8.*** ( Comment response Note: Work will replace Barrels and Bases at each location to return manholes to Pima County Standards, work to begin 9/30/24 and take 1 week to complete.. Pavement Pave Back will be corrdinated through COT Project Manager Nicholas Germanos at the conclusion of work)
Total Completed Inspections - 5
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/11/2024 | TRSP - ROW - SITE INSPECTION | Passed | ||
| 07/16/2026 | TRSP - ROW - Barricade - Setup/Routine | Passed | ||
| 07/16/2026 | TRSP - ROW - Barricade Takedown | Passed | ||
| 07/16/2026 | TRSP - ROW - Backfill - Placement/Compaction | Passed | ||
| 10/29/2026 | TRSP - ROW - Final | Passed |