Permit: TR-UTL-0924-01780
Permit Details
Status:
Complete
Type:
Right-of-Way (ROW) - Utility
Address:
2110 N STONE AV
Address NEW:
2110 N STONE AV
Apply Date:
09/16/2024
Applicant:
Adrien Pineda
Description:
ARIZONA PIPELINE WILL NEED TO EXCAVATE 1 SIDEWALK PANEL IN ORDER TO DO GAS WORK. ** BETWEEN E RILLITO ST AND E FLORES ST**
Permit Reviews
Permit Number - TR-UTL-0924-01780
Permit Status: Complete
Permit Description: ARIZONA PIPELINE WILL NEED TO EXCAVATE 1 SIDEWALK PANEL IN ORDER TO DO GAS WORK. ** BETWEEN E RILLITO ST AND E FLORES ST**
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 09/16/2024 | RIGHT-OF-WAY REVIEW v.1 | 09/18/2024 | APPROVED |
Outstanding Activity Conditions
Permit Number - TR-UTL-0924-01780
Permit Status: Complete
Permit Description: ARIZONA PIPELINE WILL NEED TO EXCAVATE 1 SIDEWALK PANEL IN ORDER TO DO GAS WORK. ** BETWEEN E RILLITO ST AND E FLORES ST**
Total Outstanding Activity Conditions - 4
| Date | Name |
|---|---|
| 09/18/2024 | PRE-CON/PAVEMENT/SIDEWALK |
| 09/18/2024 | SIDEWALK |
| 09/18/2024 | Traffic control set-up approved between 9AM - 3:30PM |
| 10/23/2024 | A NOTICE OF TEMPORARY HOLIDAY RESTRICTION applies to this permit and will be in effect from Thanksgiving Day to January 02. Due to the increasing traffic volume on many of the City’s roads, it is necessary to restrict lane closures on certain roads during the holiday season. |
Completed Inspections
Permit Status: Complete
Permit Number: TR-UTL-0924-01780
Permit Description: ARIZONA PIPELINE WILL NEED TO EXCAVATE 1 SIDEWALK PANEL IN ORDER TO DO GAS WORK. ** BETWEEN E RILLITO ST AND E FLORES ST**
Total Completed Inspections - 4
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/15/2024 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | Passed | ||
| 10/17/2024 | TRSP - ROW - Backfill - Placement/Compaction | Passed | ||
| 10/31/2024 | TRSP - ROW - Concrete - Subgrade/Forms (Pre-Pour) | Passed | ||
| 11/20/2024 | TRSP - ROW - Final | Passed |