Permit: TR-UTL-0924-01747
Permit Details
Status:
Complete
Type:
Right-of-Way (ROW) - Utility
Address:
1850 N DRAGOON ST
Address NEW:
1850 N DRAGOON ST
Apply Date:
09/13/2024
Applicant:
ANGEL MORALES
Description:
wo2788730 1850 n dragoon st 14-13-3 ne removing inoperable butterfly valve & installing new one 4lf/ar
Permit Reviews
Permit Number - TR-UTL-0924-01747
Permit Status: Complete
Permit Description: wo2788730 1850 n dragoon st 14-13-3 ne removing inoperable butterfly valve & installing new one 4lf/ar
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 09/18/2024 | RIGHT-OF-WAY REVIEW v.2 | 09/18/2024 | APPROVED |
| 09/13/2024 | RIGHT-OF-WAY REVIEW v.1 | 09/17/2024 | REQUIRES RESUBMIT |
Outstanding Activity Conditions
Permit Number - TR-UTL-0924-01747
Permit Status: Complete
Permit Description: wo2788730 1850 n dragoon st 14-13-3 ne removing inoperable butterfly valve & installing new one 4lf/ar
Total Outstanding Activity Conditions - 2
| Date | Name |
|---|---|
| 09/16/2024 | ** PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. ** PAVEMENT PATCH TYPE SHALL BE IN CONFORMANCE TO THE CURRENT EDITION OF THE CITY OF TUCSON PUBLIC UTILITY ADMINISTRTIVE MANUAL **SIDEWALK CLOSED AHEAD SIGNS SHALL BE PLACED AT THE NEAREST ADA ACCESS RAMPS PER MUTCD CHAPTER 6D. |
| 09/16/2024 | Traffic control set-up approved between 9AM - 3:30PM |
Outstanding Inspections
Permit Status: Complete
Permit Number: TR-UTL-0924-01747
Permite Description: wo2788730 1850 n dragoon st 14-13-3 ne removing inoperable butterfly valve & installing new one 4lf/ar
Total Outstanding Inspections - 3
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/18/2024 | TRSP - ROW - Barricade - Setup/Routine | N/A | Not Ready | |
| 10/18/2024 | TRSP - ROW - Backfill - Placement/Compaction | N/A | Not Ready | |
| 10/18/2024 | TRSP - ROW - Final | N/A | Not Ready |
Completed Inspections
Permit Status: Complete
Permit Number: TR-UTL-0924-01747
Permit Description: wo2788730 1850 n dragoon st 14-13-3 ne removing inoperable butterfly valve & installing new one 4lf/ar
Total Completed Inspections - 4
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/18/2024 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | Passed | ||
| 08/13/2025 | TRSP - ROW - Barricade - Setup/Routine | Passed | ||
| 08/13/2025 | TRSP - ROW - Backfill - Placement/Compaction | Passed | ||
| 08/13/2025 | TRSP - ROW - Final | Passed |