Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

PRO is currently experiencing an outage. Some documents and records may not be available on PRO momentarily. We apologize for the inconvenience and are working to restore full access.

Permit Details

Status:
Complete
Type:
Right-of-Way (ROW) - Utility
Address NEW:
325 W 2ND ST BLDG 1
Apply Date:
09/12/2024
Applicant:
Cox Communications
Description:
Cox to overlash 255' for system tie.

Permit Reviews

Permit Number - TR-UTL-0924-01739
Permit Status: Complete
Permit Description: Cox to overlash 255' for system tie.
Start Date Submittal Complete Date Status  
09/13/2024 RIGHT-OF-WAY REVIEW v.1 09/13/2024 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TR-UTL-0924-01739
Permit Status: Complete
Permit Description: Cox to overlash 255' for system tie.
Total Outstanding Activity Conditions - 3
Date Name
09/13/2024 This project is located in an Archaeological Sensitivity Zone. An Archaeological Monitor hired by the permit applicant is required to be on-site during any digging, unless a waiver is issued. Monitoring reports are to be submitted to Historic Preservation Office, City of Tucson, P.O. Box 27210, Tucson, AZ 85726.** Please contact Jodie Brown at Jodie.Brown@tucsonaz.gov with any questions.
09/13/2024 ** PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. ** PAVEMENT PATCH TYPE SHALL BE IN CONFORMANCE TO THE CURRENT EDITION OF THE CITY OF TUCSON PUBLIC UTILITY ADMINISTRTIVE MANUAL **SIDEWALK CLOSED AHEAD SIGNS SHALL BE PLACED AT THE NEAREST ADA ACCESS RAMPS PER MUTCD CHAPTER 6D.
09/13/2024 Traffic Control set-up approved between 7AM - 5PM

Completed Inspections

Permit Status: Complete
Permit Number: TR-UTL-0924-01739
Permit Description: Cox to overlash 255' for system tie.
Total Completed Inspections - 3
Date Description Inspector Results Comments
10/08/2024 TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting Passed
01/02/2025 TRSP - ROW - Barricade - Setup/Routine Passed
01/02/2025 TRSP - ROW - Final Passed