Permit: TR-UTL-0924-01737
Permit Details
Status:
Complete
Type:
Right-of-Way (ROW) - Utility
Address:
10424 E BRIDGEPORT ST
Address NEW:
10424 E BRIDGEPORT ST
Apply Date:
09/12/2024
Applicant:
Chelsey Bolinger
Description:
P.067173D (KAHNA) – BORE 5,168’ TO PLACE CTL CONDUIT & FIBER CABLE. PLACE (29) FSAI CABINET, HANDHOLES & PEDESTALS.
Permit Reviews
Permit Number - TR-UTL-0924-01737
Permit Status: Complete
Permit Description: P.067173D (KAHNA) – BORE 5,168’ TO PLACE CTL CONDUIT & FIBER CABLE. PLACE (29) FSAI CABINET, HANDHOLES & PEDESTALS.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 09/13/2024 | RIGHT-OF-WAY REVIEW v.1 | 09/16/2024 | APPROVED |
Outstanding Activity Conditions
Permit Number - TR-UTL-0924-01737
Permit Status: Complete
Permit Description: P.067173D (KAHNA) – BORE 5,168’ TO PLACE CTL CONDUIT & FIBER CABLE. PLACE (29) FSAI CABINET, HANDHOLES & PEDESTALS.
Total Outstanding Activity Conditions - 3
| Date | Name |
|---|---|
| 09/16/2024 | ** PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. ** PAVEMENT PATCH TYPE SHALL BE IN CONFORMANCE TO THE CURRENT EDITION OF THE CITY OF TUCSON PUBLIC UTILITY ADMINISTRTIVE MANUAL **SIDEWALK CLOSED AHEAD SIGNS SHALL BE PLACED AT THE NEAREST ADA ACCESS RAMPS PER MUTCD CHAPTER 6D. |
| 09/16/2024 | Traffic Control set-up approved between 7AM - 5PM |
| 09/17/2024 | Holiday Restrictions |
Completed Inspections
Permit Status: Complete
Permit Number: TR-UTL-0924-01737
Permit Description: P.067173D (KAHNA) – BORE 5,168’ TO PLACE CTL CONDUIT & FIBER CABLE. PLACE (29) FSAI CABINET, HANDHOLES & PEDESTALS.
Total Completed Inspections - 4
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 12/18/2024 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | Passed | pre-con passed with permit A on 10/21 | |
| 04/01/2025 | TRSP - ROW - Barricade - Setup/Routine | Passed | Work is complete and a barricade/traffic control inspection was never requested. | |
| 04/01/2025 | TRSP - ROW - Backfill - Placement/Compaction | Passed | Work is complete and a backfill/compaction inspection was never requested. | |
| 04/02/2025 | TRSP - ROW - Final | Passed | Work is complete. |