Permit: TR-UTL-0924-01736
Permit Details
Status:
Complete
Type:
Right-of-Way (ROW) - Utility
Address:
6446 S INLAND DR
Address NEW:
6446 S INLAND DR
Apply Date:
09/12/2024
Applicant:
Chelsey Bolinger
Description:
P.067173C (KAHNA) – BORE 5,201’ & TRENCH 71’ TO PLACE CTL CONDUIT & FIBER CABLE. PLACE (19) FSAI CABINET, HANDHOLES & PEDESTALS.
Permit Reviews
Permit Number - TR-UTL-0924-01736
Permit Status: Complete
Permit Description: P.067173C (KAHNA) – BORE 5,201’ & TRENCH 71’ TO PLACE CTL CONDUIT & FIBER CABLE. PLACE (19) FSAI CABINET, HANDHOLES & PEDESTALS.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 09/13/2024 | RIGHT-OF-WAY REVIEW v.1 | 09/17/2024 | APPROVED |
Outstanding Activity Conditions
Permit Number - TR-UTL-0924-01736
Permit Status: Complete
Permit Description: P.067173C (KAHNA) – BORE 5,201’ & TRENCH 71’ TO PLACE CTL CONDUIT & FIBER CABLE. PLACE (19) FSAI CABINET, HANDHOLES & PEDESTALS.
Total Outstanding Activity Conditions - 2
| Date | Name |
|---|---|
| 09/16/2024 | Traffic control set-up approved between 9AM - 3:30PM |
| 09/16/2024 | BUS STOP IN THE AREA, CONTACT SUN TRAN DISPATCH, AT 520-206-8934 AT LEAST 48-BUSINESS HOURS PRIOR TO START OF WORK FOR COORDINATION. |
Completed Inspections
Permit Status: Complete
Permit Number: TR-UTL-0924-01736
Permit Description: P.067173C (KAHNA) – BORE 5,201’ & TRENCH 71’ TO PLACE CTL CONDUIT & FIBER CABLE. PLACE (19) FSAI CABINET, HANDHOLES & PEDESTALS.
Total Completed Inspections - 5
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 12/18/2024 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | Passed | pre-con passed with permit A on 10/21 | |
| 04/01/2025 | TRSP - ROW - Barricade - Setup/Routine | Passed | Work is complete, but a barricade/traffic control set up inspection was never requested. | |
| 04/01/2025 | TRSP - ROW - Barricade Takedown | Passed | All traffic control has been removed from the job site | |
| 04/01/2025 | TRSP - ROW - Backfill - Placement/Compaction | Passed | Work is complete, but a backfill/compaction inspection was never requested. | |
| 04/03/2025 | TRSP - ROW - Final | Passed | Work complete. |