Permit: TR-UTL-0924-01681
Permit Details
Status:
Complete
Type:
Right-of-Way (ROW) - Utility
Address:
6210 S MORRIS BL
Address NEW:
6210 S MORRIS BL
Apply Date:
09/09/2024
Applicant:
Chelsey Bolinger
Description:
P.122873B (KAHNA) – OVERLASH 4,508’ OF AERIAL FIBER CABLE.
Permit Reviews
Permit Number - TR-UTL-0924-01681
Permit Status: Complete
Permit Description: P.122873B (KAHNA) – OVERLASH 4,508’ OF AERIAL FIBER CABLE.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 09/09/2024 | RIGHT-OF-WAY REVIEW v.1 | 09/12/2024 | REQUIRES RESUBMIT |
| 09/18/2024 | RIGHT-OF-WAY REVIEW v.2 | 09/18/2024 | REQUIRES RESUBMIT |
| 09/26/2024 | RIGHT-OF-WAY REVIEW v.3 | 09/26/2024 | APPROVED |
Outstanding Activity Conditions
Permit Number - TR-UTL-0924-01681
Permit Status: Complete
Permit Description: P.122873B (KAHNA) – OVERLASH 4,508’ OF AERIAL FIBER CABLE.
Total Outstanding Activity Conditions - 5
| Date | Name |
|---|---|
| 09/10/2024 | Alley must be restored to existing or better condition. Alley surface must be graded and compacted to City Standards and Specifications for Public Improvements and existing drainage patterns must be restored and maintained. Any disturbed gravel must be replaced. |
| 09/10/2024 | Your project work requires that you contact City of Tucson Environmental Services Department (520-791-3171) at least 24 hours prior to closing any street or alley. |
| 09/10/2024 | Traffic control set-up approved between 9AM - 3:30PM |
| 09/10/2024 | Other Permits/Projects are or will be active in your project area. Please coordinate with the project manager in charge of any existing traffic control set-ups in your project area. |
| 09/10/2024 | BUS STOP IN THE AREA, CONTACT SUN TRAN DISPATCH, AT 520-206-8934 AT LEAST 48-BUSINESS HOURS PRIOR TO START OF WORK FOR COORDINATION. |
Completed Inspections
Permit Status: Complete
Permit Number: TR-UTL-0924-01681
Permit Description: P.122873B (KAHNA) – OVERLASH 4,508’ OF AERIAL FIBER CABLE.
Total Completed Inspections - 5
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 12/23/2024 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | Passed | ||
| 04/02/2025 | TRSP - ROW - Barricade - Setup/Routine | Passed | ||
| 04/02/2025 | TRSP - ROW - Barricade Takedown | Passed | ||
| 04/02/2025 | TRSP - ROW - AERIAL INSTALLATION | Passed | ||
| 04/02/2025 | TRSP - ROW - Final | Passed |