Permit: TR-UTL-0924-01653
Permit Details
Status:
Complete
Type:
Right-of-Way (ROW) - Utility
Address:
5636 S ALVERNON WY
Address NEW:
5636 S ALVERNON WY
Apply Date:
09/02/2024
Applicant:
Chelsey Bolinger
Description:
P.122865T (KAHNA) – BORE 130’ TO PLACE CTL CONDUIT AND FIBER CABLE. PLACE (1) HANDHOLE.
Permit Reviews
Permit Number - TR-UTL-0924-01653
Permit Status: Complete
Permit Description: P.122865T (KAHNA) – BORE 130’ TO PLACE CTL CONDUIT AND FIBER CABLE. PLACE (1) HANDHOLE.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 09/03/2024 | RIGHT-OF-WAY REVIEW v.1 | 09/11/2024 | APPROVED |
Outstanding Activity Conditions
Permit Number - TR-UTL-0924-01653
Permit Status: Complete
Permit Description: P.122865T (KAHNA) – BORE 130’ TO PLACE CTL CONDUIT AND FIBER CABLE. PLACE (1) HANDHOLE.
Total Outstanding Activity Conditions - 5
| Date | Name |
|---|---|
| 09/05/2024 | COT ROW |
| 09/05/2024 | PRE-CON/PAVEMENT/SIDEWALK |
| 09/05/2024 | Traffic control set-up approved between 9AM - 3:30PM |
| 09/05/2024 | Other Permits/Projects are or will be active in your project area. Please coordinate with the project manager in charge of any existing traffic control set-ups in your project area. |
| 09/13/2024 | A NOTICE OF TEMPORARY HOLIDAY RESTRICTION applies to this permit and will be in effect from Thanksgiving Day to January 02. Due to the increasing traffic volume on many of the City’s roads, it is necessary to restrict lane closures on certain roads during the holiday season. |
Outstanding Inspections
Permit Status: Complete
Permit Number: TR-UTL-0924-01653
Permite Description: P.122865T (KAHNA) – BORE 130’ TO PLACE CTL CONDUIT AND FIBER CABLE. PLACE (1) HANDHOLE.
Total Outstanding Inspections - 3
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 11/22/2024 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | N/A | Not Applicable | during site visit, Pauley concluded existing utility locations will demand a redesign for conduit boring, job will be likely done at a later time under a new permit |
| 12/19/2024 | TRSP - ROW - Backfill - Placement/Compaction | N/A | Not Applicable | Job has been put back into redesign, will likely be done under new permit |
| 12/19/2024 | TRSP - ROW - Final | N/A | Not Applicable | Job has been put back into redesign, will likely be done under new permit |