Permit: TR-UTL-0924-01646
Permit Details
Apply Date:
09/02/2024
Applicant:
Chelsey Bolinger
Description:
P.122865M (KAHNA) - ACCESS EXISTING MH 16142 & MH 16801 FOR SPLICING.
Permit Reviews
Permit Number - TR-UTL-0924-01646
Permit Status: Complete
Permit Description: P.122865M (KAHNA) - ACCESS EXISTING MH 16142 & MH 16801 FOR SPLICING.
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
09/03/2024 | RIGHT-OF-WAY REVIEW v.1 | 09/05/2024 | APPROVED |
Outstanding Activity Conditions
Permit Number - TR-UTL-0924-01646
Permit Status: Complete
Permit Description: P.122865M (KAHNA) - ACCESS EXISTING MH 16142 & MH 16801 FOR SPLICING.
Total Outstanding Activity Conditions - 2
Date | Name |
---|---|
09/03/2024 | ** PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. ** PAVEMENT PATCH TYPE SHALL BE IN CONFORMANCE TO THE CURRENT EDITION OF THE CITY OF TUCSON PUBLIC UTILITY ADMINISTRTIVE MANUAL **SIDEWALK CLOSED AHEAD SIGNS SHALL BE PLACED AT THE NEAREST ADA ACCESS RAMPS PER MUTCD CHAPTER 6D. |
09/03/2024 | Traffic control set-up approved between 9AM - 3:30PM |
Completed Inspections
Permit Status: Complete
Permit Number: TR-UTL-0924-01646
Permit Description: P.122865M (KAHNA) - ACCESS EXISTING MH 16142 & MH 16801 FOR SPLICING.
Total Completed Inspections - 3
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
12/17/2024 | TRSP - ROW - Barricade - Setup/Routine | Passed | barricade set up not witnessed, job completed | |
12/17/2024 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | Passed | No pre-con meeting held, job complete | |
12/17/2024 | TRSP - ROW - Final | Passed | No restoration required around accessed manholes, job complete |