Permit: TR-UTL-0923-02596
Permit Details
Status:
Complete
Type:
Right-of-Way (ROW) - Utility
Address:
3613 E SPEEDWAY BL
Address NEW:
3613 E SPEEDWAY BL
Apply Date:
09/28/2023
Applicant:
Ilana Galluzzo
Description:
SWG (1) 5' x 5' bell hole in pavement along with an approx. 2' x 8' trench in pavement, and an approx. 2' x 8' trench in dirt.
Permit Reviews
Permit Number - TR-UTL-0923-02596
Permit Status: Complete
Permit Description: SWG (1) 5' x 5' bell hole in pavement along with an approx. 2' x 8' trench in
pavement, and an approx. 2' x 8' trench in dirt.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 09/28/2023 | RIGHT-OF-WAY REVIEW v.1 | 09/29/2023 | REQUIRES RESUBMIT |
| 10/03/2023 | RIGHT-OF-WAY REVIEW v.2 | 10/03/2023 | APPROVED |
Conditions
Permit Number - TR-UTL-0923-02596
Permit Status: Complete
Permit Description: SWG (1) 5' x 5' bell hole in pavement along with an approx. 2' x 8' trench in
pavement, and an approx. 2' x 8' trench in dirt.
| Date | Description | Comments |
|---|---|---|
| 09/28/2023 | ** PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. ** PAVEMENT PATCH TYPE SHALL BE IN CONFORMANCE TO THE CURRENT EDITION OF THE CITY OF TUCSON PUBLIC UTILITY ADMINISTRTIVE MANUAL **SIDEWALK CLOSED AHEAD SIGNS SHALL BE PLACED AT THE NEAREST ADA ACCESS RAMPS PER MUTCD CHAPTER 6D. | |
| 09/28/2023 | Traffic control set-up approved between 9AM - 3:30PM |
Outstanding Inspections
Permit Status: Complete
Permit Number: TR-UTL-0923-02596
Permite Description: SWG (1) 5' x 5' bell hole in pavement along with an approx. 2' x 8' trench in
pavement, and an approx. 2' x 8' trench in dirt.
Total Outstanding Inspections - 2
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 12/07/2023 | TRSP - ROW - Recurring | N/A | Complete (Recurring) | |
| 03/11/2025 | TRSP - ROW - Final/Close-Out | N/A | Failed |
Completed Inspections
Permit Status: Complete
Permit Number: TR-UTL-0923-02596
Permit Description: SWG (1) 5' x 5' bell hole in pavement along with an approx. 2' x 8' trench in
pavement, and an approx. 2' x 8' trench in dirt.
Total Completed Inspections - 2
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/19/2023 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | Passed | ||
| 07/07/2025 | TRSP - ROW - Final/Close-Out | Passed |