Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Details

Status:
Issued
Type:
Right-of-Way (ROW) - Utility
Apply Date:
09/26/2023
Applicant:
Bobby Robbins
Description:
COX TO BORE 219' TO INSTALL NEW CATV CONDUIT FOR SYSTEM TIE.

Permit Reviews

Permit Number - TR-UTL-0923-02582
Permit Status: Issued
Permit Description: COX TO BORE 219' TO INSTALL NEW CATV CONDUIT FOR SYSTEM TIE.
Start Date Submittal Complete Date Status  
10/02/2023 RIGHT-OF-WAY REVIEW v.2 10/03/2023 APPROVED Review Details
09/26/2023 RIGHT-OF-WAY REVIEW v.1 09/27/2023 REQUIRES RESUBMIT Review Details

Outstanding Activity Conditions

Permit Number - TR-UTL-0923-02582
Permit Status: Issued
Permit Description: COX TO BORE 219' TO INSTALL NEW CATV CONDUIT FOR SYSTEM TIE.
Total Outstanding Activity Conditions - 2
Date Name
09/27/2023 Traffic control set-up approved between 9AM - 3:30PM
09/27/2023 PEDESTRIAN ACCESS MUST BE PROVIDED AND MAINTIANED PER MUTCD CHAPTER 6D. FIELD ADJUSTMENTS MAY BE REQUIRED. SIDEWALK CLOSED AHEAD SIGNS SHALL BE PLACED AT THE NEAREST ADA ACCESS RAMPS PER MUTCD CHAPTER 6D.

Outstanding Inspections

Permit Status: Issued
Permit Number: TR-UTL-0923-02582
Permite Description: COX TO BORE 219' TO INSTALL NEW CATV CONDUIT FOR SYSTEM TIE.
Total Outstanding Inspections - 1
Last Inspection Date Description Inspector Results Comments
01/04/2024 TRSP - ROW - SITE INSPECTION N/A Partial Pass

Completed Inspections

Permit Status: Issued
Permit Number: TR-UTL-0923-02582
Permit Description: COX TO BORE 219' TO INSTALL NEW CATV CONDUIT FOR SYSTEM TIE.
Total Completed Inspections - 1
Date Description Inspector Results Comments
11/15/2023 TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting Passed

Documents

File Name Document Type  
COT - TR - ROW PERMIT.PDF DOCUMENTS VIEW
PRJ258693-1 REVISED TCP_V2.PDF DOCUMENTS VIEW
PRJ258693-1 TUSCON PLANS_V1.PDF DOCUMENTS VIEW