Permit: TR-UTL-0923-02575
Permit Details
Status:
Complete
Type:
Right-of-Way (ROW) - Utility
Address:
3651 S PRUDENCE RD
Address NEW:
3651 S PRUDENCE RD
Apply Date:
09/26/2023
Applicant:
Cameron Bonner
Description:
323021 Site 2 - Install Approximately 178 LF of 8" Cured in Place Pipe. The Cured in Place Pipe is a trench-less technology for sewer rehabilitation and does NOT require disturbance of the earth. In order to install the CIPP Cleanout 7262*09 will need to removed and replaced with a terminal manhole. A new concrete collar and manhole bench rehabilitation will be completed on MH 7262-52 per PCRWRD standard detail 211
Permit Reviews
Permit Number - TR-UTL-0923-02575
Permit Status: Complete
Permit Description: 323021 Site 2 - Install Approximately 178 LF of 8" Cured in Place Pipe. The Cured in Place Pipe is a trench-less technology for sewer rehabilitation and does NOT require disturbance of the earth. In order to install the CIPP Cleanout 7262*09 will need to removed and replaced with a terminal manhole. A new concrete collar and manhole bench rehabilitation will be completed on MH 7262-52 per PCRWRD standard detail 211
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 09/26/2023 | RIGHT-OF-WAY REVIEW v.1 | 09/27/2023 | APPROVED |
Outstanding Activity Conditions
Permit Number - TR-UTL-0923-02575
Permit Status: Complete
Permit Description: 323021 Site 2 - Install Approximately 178 LF of 8" Cured in Place Pipe. The Cured in Place Pipe is a trench-less technology for sewer rehabilitation and does NOT require disturbance of the earth. In order to install the CIPP Cleanout 7262*09 will need to removed and replaced with a terminal manhole. A new concrete collar and manhole bench rehabilitation will be completed on MH 7262-52 per PCRWRD standard detail 211
Total Outstanding Activity Conditions - 2
| Date | Name |
|---|---|
| 09/26/2023 | Traffic control set-up approved between 9AM - 3:30PM |
| 09/26/2023 | Pavement Patch type Shall Be in conformance to the current edition of the City of Tucson Public Utility Administrative Manual. |
Completed Inspections
Permit Status: Complete
Permit Number: TR-UTL-0923-02575
Permit Description: 323021 Site 2 - Install Approximately 178 LF of 8" Cured in Place Pipe. The Cured in Place Pipe is a trench-less technology for sewer rehabilitation and does NOT require disturbance of the earth. In order to install the CIPP Cleanout 7262*09 will need to removed and replaced with a terminal manhole. A new concrete collar and manhole bench rehabilitation will be completed on MH 7262-52 per PCRWRD standard detail 211
Total Completed Inspections - 3
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/16/2023 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | Passed | ||
| 11/03/2023 | TRSP - ROW - Recurring | Passed | ||
| 11/24/2023 | TRSP - ROW - Notice of Completion | Passed |