Permit: TR-UTL-0923-02574
Permit Details
Status:
Complete
Type:
Right-of-Way (ROW) - Utility
Address:
7101 E TAMARA DR
Address NEW:
7101 E TAMARA DR
Apply Date:
09/26/2023
Applicant:
Cameron Bonner
Description:
323021 Site 1 - Install Approximately 293 LF of 8" Cured in Place Pipe. The Cured in Place Pipe is a trench-less technology for sewer rehabilitation and does NOT require disturbance of the earth. Complete bench rehabilitation on MH's 7255-09 and MH 7255-08
Permit Reviews
Permit Number - TR-UTL-0923-02574
Permit Status: Complete
Permit Description: 323021 Site 1 - Install Approximately 293 LF of 8" Cured in Place Pipe. The Cured in Place Pipe is a trench-less technology for sewer rehabilitation and does NOT require disturbance of the earth. Complete bench rehabilitation on MH's 7255-09 and MH 7255-08
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 09/28/2023 | RIGHT-OF-WAY REVIEW v.2 | 09/28/2023 | APPROVED |
| 09/26/2023 | RIGHT-OF-WAY REVIEW v.1 | 09/27/2023 | REQUIRES RESUBMIT |
Conditions
Permit Number - TR-UTL-0923-02574
Permit Status: Complete
Permit Description: 323021 Site 1 - Install Approximately 293 LF of 8" Cured in Place Pipe. The Cured in Place Pipe is a trench-less technology for sewer rehabilitation and does NOT require disturbance of the earth. Complete bench rehabilitation on MH's 7255-09 and MH 7255-08
| Date | Description | Comments |
|---|---|---|
| 09/26/2023 | BUS STOP IN THE AREA, CONTACT SUN TRAN DISPATCH, AT 520-206-8934 AND/OR BEA PAULUS AT 520-206-8826 AT LEAST 48-BUSINESS HOURS PRIOR TO START OF WORK FOR COORDINATION. | |
| 09/26/2023 | Traffic control set-up approved between 9AM - 3:30PM |
Outstanding Inspections
Permit Status: Complete
Permit Number: TR-UTL-0923-02574
Permite Description: 323021 Site 1 - Install Approximately 293 LF of 8" Cured in Place Pipe. The Cured in Place Pipe is a trench-less technology for sewer rehabilitation and does NOT require disturbance of the earth. Complete bench rehabilitation on MH's 7255-09 and MH 7255-08
Total Outstanding Inspections - 1
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 11/03/2023 | TRSP - ROW - Recurring | N/A | Complete (Recurring) |
Completed Inspections
Permit Status: Complete
Permit Number: TR-UTL-0923-02574
Permit Description: 323021 Site 1 - Install Approximately 293 LF of 8" Cured in Place Pipe. The Cured in Place Pipe is a trench-less technology for sewer rehabilitation and does NOT require disturbance of the earth. Complete bench rehabilitation on MH's 7255-09 and MH 7255-08
Total Completed Inspections - 3
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/27/2023 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | Passed | ||
| 01/19/2024 | TRSP - ROW - Recurring | Passed | ||
| 01/19/2024 | TRSP - ROW - Final/Close-Out | Passed |