Permit Details

Status:
Complete
Type:
Right-of-Way (ROW) - Utility
Address NEW:
1801 N BEVERLY AV
Apply Date:
09/22/2023
Applicant:
Andres Amado
Description:
700 ft of new 12 in. water main to connect the well on 1801 N. Beverly Ave to the existing water main on Pima St.

Permit Reviews

Permit Number - TR-UTL-0923-02559
Permit Status: Complete
Permit Description: 700 ft of new 12 in. water main to connect the well on 1801 N. Beverly Ave to the existing water main on Pima St.
Start Date Submittal Complete Date Status  
10/06/2023 RIGHT-OF-WAY REVIEW v.1 10/11/2023 REQUIRES RESUBMIT Review Details
10/13/2023 RIGHT-OF-WAY REVIEW v.2 10/16/2023 APPROVED Review Details

Conditions

Permit Number - TR-UTL-0923-02559
Permit Status: Complete
Permit Description: 700 ft of new 12 in. water main to connect the well on 1801 N. Beverly Ave to the existing water main on Pima St.
Date Description Comments
10/06/2023 ** PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. ** PAVEMENT PATCH TYPE SHALL BE IN CONFORMANCE TO THE CURRENT EDITION OF THE CITY OF TUCSON PUBLIC UTILITY ADMINISTRATIVE MANUAL. **SIDEWALK CLOSED AHEAD SIGNS SHALL BE PLACED AT THE NEAREST ADA ACCESS RAMPS PER MUTCD CHAPTER 6D.
10/06/2023 Traffic control set-up approved between 9AM - 3:30PM

Outstanding Inspections

Permit Status: Complete
Permit Number: TR-UTL-0923-02559
Permite Description: 700 ft of new 12 in. water main to connect the well on 1801 N. Beverly Ave to the existing water main on Pima St.
Total Outstanding Inspections - 1
Last Inspection Date Description Inspector Results Comments
02/21/2024 TRSP - ROW - Recurring N/A Complete (Recurring)

Completed Inspections

Permit Status: Complete
Permit Number: TR-UTL-0923-02559
Permit Description: 700 ft of new 12 in. water main to connect the well on 1801 N. Beverly Ave to the existing water main on Pima St.
Total Completed Inspections - 2
Date Description Inspector Results Comments
10/31/2023 TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting Passed
08/27/2024 TRSP - ROW - Final/Close-Out Passed

Documents

File Name Document Type  
COT - TR - ROW PERMIT.PDF DOCUMENTS VIEW
TRAFICADE TCP BEVERLY WITH DETOUR .0_V2.PDF DOCUMENTS VIEW
TRAFICADE TCP BEVERLY WITH DETOUR .0_V2.PDF DOCUMENTS VIEW
BEVERLY AVE 12 IN WATER MAIN ROW_V1.PDF DOCUMENTS VIEW