Permit: TR-UTL-0923-02550
Permit Details
Status:
Complete
Type:
Right-of-Way (ROW) - Utility
Address:
2031 S MARCH PL
Address NEW:
2031 S MARCH PL
Apply Date:
09/21/2023
Applicant:
Ilana Galluzzo
Description:
(1) 3’ x 6’ bell hole in dirt along with an approximate 2’ x 16’ trench in pavement.
Permit Reviews
Permit Number - TR-UTL-0923-02550
Permit Status: Complete
Permit Description: (1) 3’ x 6’ bell hole in dirt along with an approximate 2’ x 16’ trench in
pavement.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 09/21/2023 | RIGHT-OF-WAY REVIEW v.1 | 09/28/2023 | APPROVED |
Conditions
Permit Number - TR-UTL-0923-02550
Permit Status: Complete
Permit Description: (1) 3’ x 6’ bell hole in dirt along with an approximate 2’ x 16’ trench in
pavement.
| Date | Description | Comments |
|---|---|---|
| 09/28/2023 | Your project work requires that you contact City of Tucson Environmental Services Department (520-791-3171) at least 24 hours prior to closing any street or alley. | |
| 09/21/2023 | ** PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. ** PAVEMENT PATCH TYPE SHALL BE IN CONFORMANCE TO THE CURRENT EDITION OF THE CITY OF TUCSON PUBLIC UTILITY ADMINISTRTIVE MANUAL **SIDEWALK CLOSED AHEAD SIGNS SHALL BE PLACED AT THE NEAREST ADA ACCESS RAMPS PER MUTCD CHAPTER 6D. | |
| 09/21/2023 | Traffic Control set-up approved between 7AM - 5PM |
Completed Inspections
Permit Status: Complete
Permit Number: TR-UTL-0923-02550
Permit Description: (1) 3’ x 6’ bell hole in dirt along with an approximate 2’ x 16’ trench in
pavement.
Total Completed Inspections - 3
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 01/24/2024 | TRSP - ROW - Final/Close-Out | Passed | ||
| 01/24/2024 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | Passed | ||
| 01/24/2024 | TRSP - ROW - Recurring | Passed |