Permit Details

Status:
Complete
Type:
Right-of-Way (ROW) - Utility
Address:
3432 S SANTEE AV
Apply Date:
09/19/2023
Applicant:
Jaime Rivera
Description:
323019 Site 2 - Install Approximately 353 LF of 8" Cured in Place Pipe. The Cured in Place Pipe is a trench-less technology for sewer rehabilitation and does NOT require disturbance of the earth. New concrete collars and manhole bench rehabilitation will be completed on MH's 9591-5-K and MH 9591-5-J per PCRWRD standard detail 211

Permit Reviews

Permit Number - TR-UTL-0923-02526
Permit Status: Complete
Permit Description: 323019 Site 2 - Install Approximately 353 LF of 8" Cured in Place Pipe. The Cured in Place Pipe is a trench-less technology for sewer rehabilitation and does NOT require disturbance of the earth. New concrete collars and manhole bench rehabilitation will be completed on MH's 9591-5-K and MH 9591-5-J per PCRWRD standard detail 211
Start Date Submittal Complete Date Status  
09/21/2023 RIGHT-OF-WAY REVIEW v.1 09/21/2023 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TR-UTL-0923-02526
Permit Status: Complete
Permit Description: 323019 Site 2 - Install Approximately 353 LF of 8" Cured in Place Pipe. The Cured in Place Pipe is a trench-less technology for sewer rehabilitation and does NOT require disturbance of the earth. New concrete collars and manhole bench rehabilitation will be completed on MH's 9591-5-K and MH 9591-5-J per PCRWRD standard detail 211
Total Outstanding Activity Conditions - 2
Date Name
09/21/2023 Traffic Control set-up approved between 7AM - 5PM
09/21/2023 Pavement Patch type Shall Be in conformance to the current edition of the City of Tucson Public Utility Administrative Manual

Completed Inspections

Permit Status: Complete
Permit Number: TR-UTL-0923-02526
Permit Description: 323019 Site 2 - Install Approximately 353 LF of 8" Cured in Place Pipe. The Cured in Place Pipe is a trench-less technology for sewer rehabilitation and does NOT require disturbance of the earth. New concrete collars and manhole bench rehabilitation will be completed on MH's 9591-5-K and MH 9591-5-J per PCRWRD standard detail 211
Total Completed Inspections - 3
Date Description Inspector Results Comments
10/11/2023 TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting Passed
01/23/2024 TRSP - ROW - Final/Close-Out Passed
01/23/2024 TRSP - ROW - Recurring Passed

Documents

File Name Document Type  
323019 - SITE 2 FMP MAP (3400 S SANTEE AVE)_V1.PDF DOCUMENTS VIEW
DB 68408 - PAGE 2 - 3400 S SANTEE AVE - ALLEY CLOSURE - 8110 - 3230X1_V1.PDF DOCUMENTS VIEW
COT - TR - ROW PERMIT.PDF DOCUMENTS VIEW