Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit: TR-UTL-0923-02485
Permit Details
Apply Date:
09/12/2023
Applicant:
Think Safety Inc
Description:
TRENCH10' TO INSTALL NEW CATV CONDUIT FOR SYSTEM TIE INTERCEPT & PULL THROUGH EXISTING COX PED 308'
Permit Reviews
Permit Number - TR-UTL-0923-02485
Permit Status: Complete
Permit Description: TRENCH10' TO INSTALL NEW CATV CONDUIT FOR SYSTEM TIE INTERCEPT & PULL THROUGH EXISTING COX PED 308'
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
09/12/2023 | RIGHT-OF-WAY REVIEW v.1 | 09/12/2023 | APPROVED |
Outstanding Activity Conditions
Permit Number - TR-UTL-0923-02485
Permit Status: Complete
Permit Description: TRENCH10' TO INSTALL NEW CATV CONDUIT FOR SYSTEM TIE INTERCEPT & PULL THROUGH EXISTING COX PED 308'
Total Outstanding Activity Conditions - 3
Date | Name |
---|---|
09/12/2023 | Traffic Control set-up approved between 7AM - 5PM |
09/12/2023 | PEDESTRIAN ACCESS MUST BE PROVIDED AND MAINTIANED PER MUTCD CHAPTER 6D. FIELD ADJUSTMENTS MAY BE REQUIRED. SIDEWALK CLOSED AHEAD SIGNS SHALL BE PLACED AT THE NEAREST ADA ACCESS RAMPS PER MUTCD CHAPTER 6D. |
09/15/2023 | A NOTICE OF TEMPORARY HOLIDAY RESTRICTION applies to this permit and will be in effect from Thanksgiving Day to January 02. Due to the increasing traffic volume on many of the City’s roads, it is necessary to restrict lane closures on certain roads during the holiday season. |
Outstanding Inspections
Permit Status: Complete
Permit Number: TR-UTL-0923-02485
Permite Description: TRENCH10' TO INSTALL NEW CATV CONDUIT FOR SYSTEM TIE INTERCEPT & PULL THROUGH EXISTING COX PED 308'
Total Outstanding Inspections - 1
Last Inspection Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
09/26/2023 | TRSP - ROW - Recurring | N/A | Complete (Recurring) |
Completed Inspections
Permit Status: Complete
Permit Number: TR-UTL-0923-02485
Permit Description: TRENCH10' TO INSTALL NEW CATV CONDUIT FOR SYSTEM TIE INTERCEPT & PULL THROUGH EXISTING COX PED 308'
Total Completed Inspections - 2
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
10/05/2023 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | Passed | ||
11/01/2023 | TRSP - ROW - Final/Close-Out | Passed |