Permit: TR-UTL-0923-02479
Permit Details
Apply Date:
09/11/2023
Applicant:
Think Safety Inc
Description:
PRJ257246-1 Cox to overlash new 144ct fiber on 10 poles 1,094', trench 7' and bore 200' for CATV service tie in.
Permit Reviews
Permit Number - TR-UTL-0923-02479
Permit Status: Complete
Permit Description: PRJ257246-1 Cox to overlash new 144ct fiber on 10 poles 1,094', trench 7' and bore 200' for CATV service tie in.
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
09/12/2023 | RIGHT-OF-WAY REVIEW v.1 | 09/15/2023 | REQUIRES RESUBMIT |
09/21/2023 | RIGHT-OF-WAY REVIEW v.2 | 09/26/2023 | APPROVED |
Outstanding Activity Conditions
Permit Number - TR-UTL-0923-02479
Permit Status: Complete
Permit Description: PRJ257246-1 Cox to overlash new 144ct fiber on 10 poles 1,094', trench 7' and bore 200' for CATV service tie in.
Total Outstanding Activity Conditions - 4
Date | Name |
---|---|
09/12/2023 | BUS STOP IN AREA, CONTACT SUN TRAN DISPATCH AT 520-206-8934 AND/OR BEA PAULUS AT 520-206-8826 AT LEAST 48-BUISNESS HOURS PRIOR TO START OF WORK FOR COORDINATION. |
09/12/2023 | Traffic control set-up approved between 9AM - 3:30PM |
09/12/2023 | PEDESTRIAN ACCESS MUST BE PROVIDED AND MAINTIANED PER MUTCD CHAPTER 6D. FIELD ADJUSTMENTS MAY BE REQUIRED. SIDEWALK CLOSED AHEAD SIGNS SHALL BE PLACED AT THE NEAREST ADA ACCESS RAMPS PER MUTCD CHAPTER 6D. |
10/10/2023 | A NOTICE OF TEMPORARY HOLIDAY RESTRICTION applies to this permit and will be in effect from Thanksgiving Day to January 02. Due to the increasing traffic volume on many of the City’s roads, it is necessary to restrict lane closures on certain roads during the holiday season. |
Completed Inspections
Permit Status: Complete
Permit Number: TR-UTL-0923-02479
Permit Description: PRJ257246-1 Cox to overlash new 144ct fiber on 10 poles 1,094', trench 7' and bore 200' for CATV service tie in.
Total Completed Inspections - 3
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
10/25/2023 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | Passed | no moratorium. micro surface if necessary | |
11/14/2023 | TRSP - ROW - Final/Close-Out | Passed | ||
11/14/2023 | TRSP - ROW - Recurring | Passed |