Permit: TR-UTL-0826-01466
Permit Details
Status:
Needs Resubmittal
Type:
Right-of-Way (ROW) - Utility
Address:
3322 E 26TH ST
Address NEW:
3322 E 26TH ST
Apply Date:
08/28/2026
Applicant:
ANGEL MORALES
Description:
P.358403B Overbuild Trench 24' to place conduit and fiber cable Place 2 pedestals/cabinets/vaults Place 1315' of aerial fiber cable
Permit Reviews
Permit Number - TR-UTL-0826-01466
Permit Status: Needs resubmittal
Permit Description: P.358403B Overbuild
Trench 24' to place conduit and fiber cable
Place 2 pedestals/cabinets/vaults
Place 1315' of aerial fiber cable
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 08/31/2026 | RIGHT-OF-WAY REVIEW v.1 | 09/18/2026 | REQUIRES RESUBMIT |
Outstanding Activity Conditions
Permit Number - TR-UTL-0826-01466
Permit Status: Needs resubmittal
Permit Description: P.358403B Overbuild
Trench 24' to place conduit and fiber cable
Place 2 pedestals/cabinets/vaults
Place 1315' of aerial fiber cable
Total Outstanding Activity Conditions - 8
| Date | Name |
|---|---|
| 09/03/2026 | ROW Permit is only allowed for work within City of Tucson Right of Way. |
| 09/03/2026 | Traffic Control set-up approved between 7AM - 5PM |
| 09/03/2026 | Other Permits/Projects are or will be active in your project area. Please coordinate with the project manager in charge of any existing traffic control set-ups in your project area. |
| 09/03/2026 | UNDER A PAVEMENT MORATORIUM, ANY NEW ASPHALT THAT IS DISTURBED WILL REQUIRE A 2” MILL AND OVERLAY FOR 25’ IN EACH DIRECTION FROM THE OUTSIDE OF THE CUT FOR ALL EFFECTED TRAVEL LANES. |
| 09/03/2026 | Pre- activity/construction meeting with City inspectors to be held 72 hours in advance of work start. Please request Inspections in your permit portal on TDC Online. |
| 09/03/2026 | Driveways and private property shall NOT be utilized without the owner’s consent. It is the contractor’s responsibility to negotiate use of private property. |
| 09/03/2026 | PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. |
| 09/18/2026 | All excavations shall be secured for safety at the end of each shift. If pedestrian access cannot be maintained, a temporary protected pedestrian route shall be provided. All open trenches shall be protected by Type II barricades with Type A flashers and surrounded by a barrier fence. Trenches deeper than 4 feet shall be surrounded by chain-link fence. Excavations may need to be covered with steel plates or other approved materials at the end of each shift. |