Permit Details

Status:
Needs Resubmittal
Type:
Right-of-Way (ROW) - Utility
Address:
3361 E 23RD ST
Address NEW:
3361 E 23RD ST
Apply Date:
08/28/2026
Applicant:
ANGEL MORALES
Description:
P.358403A Overbuild: Place 5135' of aerial fiber cable

Permit Reviews

Permit Number - TR-UTL-0826-01465
Permit Status: Needs resubmittal
Permit Description: P.358403A Overbuild: Place 5135' of aerial fiber cable
Start Date Submittal Complete Date Status  
08/31/2026 RIGHT-OF-WAY REVIEW v.1 09/16/2026 REQUIRES RESUBMIT Review Details

Outstanding Activity Conditions

Permit Number - TR-UTL-0826-01465
Permit Status: Needs resubmittal
Permit Description: P.358403A Overbuild: Place 5135' of aerial fiber cable
Total Outstanding Activity Conditions - 7
Date Name
09/02/2026 1. Posted Speeds 30 Mph or Less – Less than 14 lane - Use of the R4-11 alone is acceptable and preferred over Share the Road sign - 2. Posted Speeds 30 Mph or less – greater than 14 lane - Use of Share The Road sign is preferred 3. Posted Speeds 30 Mph or More – Any Lane Size - Provide a reasonable alternative for cyclists, such as a paved path, space behind barricades, or bike detour. Acceptable to direct cyclists to the sidewalk when properly signed depending on conditions 4. Bike lane to be maintained within Traffic Control closure and Share may Pedestrian detour path with proper R9-6 Sign.
09/02/2026 BUS STOP IN THE AREA, CONTACT SUN TRAN DISPATCH, AT 520-206-8934 AT LEAST 48-BUSINESS HOURS PRIOR TO START OF WORK FOR COORDINATION.
09/02/2026 ROW Permit is only allowed for work within City of Tucson Right of Way.
09/02/2026 Driveways and private property shall NOT be utilized without the owner’s consent. It is the contractor’s responsibility to negotiate use of private property.
09/02/2026 UNDER A PAVEMENT MORATORIUM, ANY NEW ASPHALT THAT IS DISTURBED WILL REQUIRE A 2” MILL AND OVERLAY FOR 25’ IN EACH DIRECTION FROM THE OUTSIDE OF THE CUT FOR ALL EFFECTED TRAVEL LANES.
09/02/2026 Pre- activity/construction meeting with City inspectors to be held 72 hours in advance of work start. Please request Inspections in your permit portal on TDC Online.
09/02/2026 PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING.

Documents

File Name Document Type  
DESIGN PLAN-P.358403 CIVIL PERMIT A (7-16-26)-B1_V1.PDF DOCUMENTS VIEW