Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

PRO is currently experiencing an outage. Some documents and records may not be available on PRO momentarily. We apologize for the inconvenience and are working to restore full access.

Permit Details

Status:
Needs Resubmittal
Type:
Right-of-Way (ROW) - Utility
Address:
4790 E GRANT RD
Address NEW:
4790 E GRANT RD
Apply Date:
08/27/2026
Applicant:
Cox Communications
Description:
The proposed scope of work is limited to a fiber backhaul upgrade and T-Mobile will be installing a new Midway vault in the ROW, while largely utilizing existing conduit routing within the leased area. No disturbance to traffic required.

Permit Reviews

Permit Number - TR-UTL-0826-01458
Permit Status: Needs resubmittal
Permit Description: The proposed scope of work is limited to a fiber backhaul upgrade and T-Mobile will be installing a new Midway vault in the ROW, while largely utilizing existing conduit routing within the leased area. No disturbance to traffic required.
Start Date Submittal Complete Date Status  
08/27/2026 RIGHT-OF-WAY REVIEW v.1 N/A REQUIRES RESUBMIT Review Details

Outstanding Activity Conditions

Permit Number - TR-UTL-0826-01458
Permit Status: Needs resubmittal
Permit Description: The proposed scope of work is limited to a fiber backhaul upgrade and T-Mobile will be installing a new Midway vault in the ROW, while largely utilizing existing conduit routing within the leased area. No disturbance to traffic required.
Total Outstanding Activity Conditions - 6
Date Name
09/01/2026 BUS STOP IN THE AREA, CONTACT SUN TRAN DISPATCH, AT 520-206-8934 AT LEAST 48-BUSINESS HOURS PRIOR TO START OF WORK FOR COORDINATION.
09/01/2026 Traffic control set-up approved between 9AM - 3:30PM
09/01/2026 Other Permits/Projects are or will be active in your project area. Please coordinate with the project manager in charge of any existing traffic control set-ups in your project area.
09/01/2026 UNDER A PAVEMENT MORATORIUM, ANY NEW ASPHALT THAT IS DISTURBED WILL REQUIRE A 2” MILL AND OVERLAY FOR 25’ IN EACH DIRECTION FROM THE OUTSIDE OF THE CUT FOR ALL EFFECTED TRAVEL LANES.
09/01/2026 Pre- activity/construction meeting with City inspectors to be held 72 hours in advance of work start. Please request Inspections in your permit portal on TDC Online.
09/01/2026 PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING.