Permit: TR-UTL-0826-01457
Permit Details
Status:
Inspections
Type:
Right-of-Way (ROW) - Utility
Address:
3350 N 1ST AV
Address NEW:
3350 N 1ST AV
Apply Date:
08/27/2026
Applicant:
Brittany West
Description:
Boring 2- 2" conduits for a total or 130' at a depth of 36" and installing new aireal strand and fiber for a total of 5240', Overlashing total of 6020' and installing a 432 count fiber for the whole project.
Permit Reviews
Permit Number - TR-UTL-0826-01457
Permit Status: Inspections
Permit Description: Boring 2- 2" conduits for a total or 130' at a depth of 36" and installing new aireal strand and fiber for a total of 5240', Overlashing total of 6020' and installing a 432 count fiber for the whole project.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 09/23/2026 | RIGHT-OF-WAY REVIEW v.2 | 10/19/2026 | REQUIRES RESUBMIT |
| 10/25/2026 | RIGHT-OF-WAY REVIEW v.4 | 10/26/2026 | APPROVED |
| 08/27/2026 | RIGHT-OF-WAY REVIEW v.1 | N/A | REQUIRES RESUBMIT |
| 10/21/2026 | RIGHT-OF-WAY REVIEW v.3 | 10/23/2026 | REQUIRES RESUBMIT |
Outstanding Activity Conditions
Permit Number - TR-UTL-0826-01457
Permit Status: Inspections
Permit Description: Boring 2- 2" conduits for a total or 130' at a depth of 36" and installing new aireal strand and fiber for a total of 5240', Overlashing total of 6020' and installing a 432 count fiber for the whole project.
Total Outstanding Activity Conditions - 6
| Date | Name |
|---|---|
| 09/01/2026 | 1. Posted Speeds 30 Mph or Less – Less than 14 lane - Use of the R4-11 alone is acceptable and preferred over Share the Road sign - 2. Posted Speeds 30 Mph or less – greater than 14 lane - Use of Share The Road sign is preferred 3. Posted Speeds 30 Mph or More – Any Lane Size - Provide a reasonable alternative for cyclists, such as a paved path, space behind barricades, or bike detour. Acceptable to direct cyclists to the sidewalk when properly signed depending on conditions 4. Bike lane to be maintained within Traffic Control closure and Share may Pedestrian detour path with proper R9-6 Sign. |
| 09/01/2026 | Traffic control set-up approved between 9AM - 3:30PM |
| 09/01/2026 | Other Permits/Projects are or will be active in your project area. Please coordinate with the project manager in charge of any existing traffic control set-ups in your project area. |
| 09/01/2026 | UNDER A PAVEMENT MORATORIUM, ANY NEW ASPHALT THAT IS DISTURBED WILL REQUIRE A 2” MILL AND OVERLAY FOR 25’ IN EACH DIRECTION FROM THE OUTSIDE OF THE CUT FOR ALL EFFECTED TRAVEL LANES. |
| 09/01/2026 | Pre- activity/construction meeting with City inspectors to be held 72 hours in advance of work start. Please request Inspections in your permit portal on TDC Online. |
| 09/01/2026 | PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. |
Outstanding Inspections
Permit Status: Inspections
Permit Number: TR-UTL-0826-01457
Permite Description: Boring 2- 2" conduits for a total or 130' at a depth of 36" and installing new aireal strand and fiber for a total of 5240', Overlashing total of 6020' and installing a 432 count fiber for the whole project.
Total Outstanding Inspections - 1
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/28/2026 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | N/A | Re-inspection required | Has the wrong TCP need resubmitted for the TCP and approval would be awesome if they expedited this one |