Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

PRO is currently experiencing an outage. Some documents and records may not be available on PRO momentarily. We apologize for the inconvenience and are working to restore full access.

Permit Details

Status:
Approved
Type:
Right-of-Way (ROW) - Utility
Address:
74 W KENNEDY ST
Address NEW:
74 W KENNEDY ST
Apply Date:
08/26/2026
Applicant:
Adrien Pineda
Description:
ARIZONA PIPELINE WILL NEED TO EXCAVATE (1)5'X5' BELL HOLE IN THE ASPHALT ROW IN ORDER TO ABANDON THE GAS SERVICE FOR 74 W KENNEDY ST

Permit Reviews

Permit Number - TR-UTL-0826-01454
Permit Status: Approved
Permit Description: ARIZONA PIPELINE WILL NEED TO EXCAVATE (1)5'X5' BELL HOLE IN THE ASPHALT ROW IN ORDER TO ABANDON THE GAS SERVICE FOR 74 W KENNEDY ST
Start Date Submittal Complete Date Status  
08/27/2026 RIGHT-OF-WAY REVIEW v.1 N/A APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TR-UTL-0826-01454
Permit Status: Approved
Permit Description: ARIZONA PIPELINE WILL NEED TO EXCAVATE (1)5'X5' BELL HOLE IN THE ASPHALT ROW IN ORDER TO ABANDON THE GAS SERVICE FOR 74 W KENNEDY ST
Total Outstanding Activity Conditions - 4
Date Name
08/31/2026 **Pre-Activity Meeting w/Inspections **Pre- activity/construction meeting with City inspectors to be held 72 hours in advance of work start. Please request Inspections in your permit portal on TDC Online. ** PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. ** PAVEMENT PATCH TYPE SHALL BE IN CONFORMANCE TO THE CURRENT EDITION OF THE CITY OF TUCSON PUBLIC UTILITY ADMINISTRTIVE MANUAL **Pedestrian Access & Sidewalk PEDESTRIAN ACCESS MUST BE PROVIDED AND MAINTIANED PER MUTCD CHAPTER 6D. FIELD ADJUSTMENTS MAY BE REQUIRED. REPLACE/REPAIR SIDEWALK PANELS PER PAG STANDARD DETAIL 200\206 . PEDESTRIAN DETOUR ROUTE ON SAME SIDE OF RIGHT OF WAY TO BE PROVIDED. PER CITY CODE AND POLICY. Refer to MUTCD Chapter 6 Figure 6P-28, and 6K figure 6K-2. Refer to COT Utility manual Page 41 – 42 Refer to COT 2015 Addition to the MUTCD section 14
08/31/2026 Traffic Control set-up approved between 7AM - 5PM
09/02/2026 Noted 1-3 day set up= $0 Loss of Use fee. No Estimate provided at this time. Total Loss of Use to be determined by physical field inspection review at Permit Closeout
09/02/2026 Other Permits/Projects are or will be active in your project area. Please coordinate with the project manager in charge of any existing traffic control set-ups in your project area.