Permit Details

Status:
Issued
Type:
Right-of-Way (ROW) - Utility
Address:
5901 E 23RD ST
Address NEW:
5901 E 23RD ST
Apply Date:
08/26/2026
Applicant:
Arnulfo Quiroz
Description:
WO T159032. Crews to park in the City of Tucson ROW to replace (20) TEP poles, Install (1) New TEP Pole, OH conductors, and OH attachments. Down guy anchors are to be replaced at (4) pole locations. Total Working Days: 52 days. 11/02/2026 ** Request for 30 Day Renewal as of 11/13/2026 **

Permit Reviews

Permit Number - TR-UTL-0826-01453
Permit Status: Issued
Permit Description: WO T159032. Crews to park in the City of Tucson ROW to replace (20) TEP poles, Install (1) New TEP Pole, OH conductors, and OH attachments. Down guy anchors are to be replaced at (4) pole locations. Total Working Days: 52 days. 11/02/2026 ** Request for 30 Day Renewal as of 11/13/2026 **
Start Date Submittal Complete Date Status  
09/01/2026 RIGHT-OF-WAY REVIEW v.2 09/08/2026 APPROVED Review Details
08/26/2026 RIGHT-OF-WAY REVIEW v.1 08/31/2026 REQUIRES RESUBMIT Review Details

Outstanding Activity Conditions

Permit Number - TR-UTL-0826-01453
Permit Status: Issued
Permit Description: WO T159032. Crews to park in the City of Tucson ROW to replace (20) TEP poles, Install (1) New TEP Pole, OH conductors, and OH attachments. Down guy anchors are to be replaced at (4) pole locations. Total Working Days: 52 days. 11/02/2026 ** Request for 30 Day Renewal as of 11/13/2026 **
Total Outstanding Activity Conditions - 2
Date Name
08/27/2026 **Pre-Activity Meeting w/Inspections **Pre- activity/construction meeting with City inspectors to be held 72 hours in advance of work start. Please request Inspections in your permit portal on TDC Online. ** PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. ** PAVEMENT PATCH TYPE SHALL BE IN CONFORMANCE TO THE CURRENT EDITION OF THE CITY OF TUCSON PUBLIC UTILITY ADMINISTRTIVE MANUAL **Pedestrian Access & Sidewalk PEDESTRIAN ACCESS MUST BE PROVIDED AND MAINTIANED PER MUTCD CHAPTER 6D. FIELD ADJUSTMENTS MAY BE REQUIRED. REPLACE/REPAIR SIDEWALK PANELS PER PAG STANDARD DETAIL 200\206 . PEDESTRIAN DETOUR ROUTE ON SAME SIDE OF RIGHT OF WAY TO BE PROVIDED. PER CITY CODE AND POLICY. Refer to MUTCD Chapter 6 Figure 6P-28, and 6K figure 6K-2. Refer to COT Utility manual Page 41 – 42 Refer to COT 2015 Addition to the MUTCD section 14
09/04/2026 Traffic Control set-up approved between 7AM - 5PM

Completed Inspections

Permit Status: Issued
Permit Number: TR-UTL-0826-01453
Permit Description: WO T159032. Crews to park in the City of Tucson ROW to replace (20) TEP poles, Install (1) New TEP Pole, OH conductors, and OH attachments. Down guy anchors are to be replaced at (4) pole locations. Total Working Days: 52 days. 11/02/2026 ** Request for 30 Day Renewal as of 11/13/2026 **
Total Completed Inspections - 1
Date Description Inspector Results Comments
10/12/2026 TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting Passed Site is ready for work to begin at contractors discretion.

Documents

File Name Document Type  
COT - TR - ROW PERMIT (SSRS).PDF DOCUMENTS VIEW