Permit: TR-UTL-0826-01443
Permit Details
Status:
Inspections
Type:
Right-of-Way (ROW) - Utility
Address:
2517 S SAHUARA AV
Address NEW:
2517 S SAHUARA AV
Apply Date:
08/25/2026
Applicant:
Austin Eslick
Description:
Crews to park in the City of Tucson ROW to replace (15) TEP poles, OH conductors, and OH attachments. Down guy anchors are to be replaced at (9) pole locations.. No sidewalk impact. 2’x2’ excavations per pole.
Permit Reviews
Permit Number - TR-UTL-0826-01443
Permit Status: Inspections
Permit Description: Crews to park in the City of Tucson ROW to replace (15) TEP poles, OH conductors, and OH attachments. Down guy anchors are to be replaced at (9) pole locations.. No sidewalk impact. 2’x2’ excavations per pole.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 09/01/2026 | RIGHT-OF-WAY REVIEW v.2 | 09/08/2026 | APPROVED |
| 08/25/2026 | RIGHT-OF-WAY REVIEW v.1 | 08/31/2026 | REQUIRES RESUBMIT |
Outstanding Activity Conditions
Permit Number - TR-UTL-0826-01443
Permit Status: Inspections
Permit Description: Crews to park in the City of Tucson ROW to replace (15) TEP poles, OH conductors, and OH attachments. Down guy anchors are to be replaced at (9) pole locations.. No sidewalk impact. 2’x2’ excavations per pole.
Total Outstanding Activity Conditions - 5
| Date | Name |
|---|---|
| 08/26/2026 | Traffic control set-up approved between 9AM - 3:30PM |
| 08/26/2026 | Other Permits/Projects are or will be active in your project area. Please coordinate with the project manager in charge of any existing traffic control set-ups in your project area. |
| 08/28/2026 | Lane closures shall only be permitted during active work operations. At the end of each workday, the contractor shall remove all traffic control devices and reopen the roadway, bike lanes, and sidewalks to normal operation. Twenty-four (24) hour lane closures are not permitted unless specifically approved by the City. Traffic Control Devices shall not be stored in the bike lane or sidewalk - The contractor shall restore all disturbed pavement in accordance with the City of Tucson Standard Specifications for Public Improvements and applicable standard details. All pavement patches shall match the existing pavement section and surface condition. The contractor shall maintain all temporary patches in a safe and drivable condition until permanent restoration is completed. Any settlement, cracking, or pavement failure within the patched area shall be repaired by the contractor at no cost to the City for the duration of the warranty period |
| 08/28/2026 | Pre-Activity Meeting w/Inspections Pre- activity/construction meeting with City inspectors to be held 72 hours in advance of work start. Please request Inspections in your permit portal on TDC Online. PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. |
| 08/28/2026 | Traffic Control set-up approved between 7AM - 5PM |
Outstanding Inspections
Permit Status: Inspections
Permit Number: TR-UTL-0826-01443
Permite Description: Crews to park in the City of Tucson ROW to replace (15) TEP poles, OH conductors, and OH attachments. Down guy anchors are to be replaced at (9) pole locations.. No sidewalk impact. 2’x2’ excavations per pole.
Total Outstanding Inspections - 1
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 09/28/2026 | TRSP - ROW - Barricade - Setup/Routine | N/A | Complete (Recurring) | devices for Sahuara work are in place with advanced warning signs, tapering lanes, and snow fencing for excavations. Next setup will be for Golf Links. |
Completed Inspections
Permit Status: Inspections
Permit Number: TR-UTL-0826-01443
Permit Description: Crews to park in the City of Tucson ROW to replace (15) TEP poles, OH conductors, and OH attachments. Down guy anchors are to be replaced at (9) pole locations.. No sidewalk impact. 2’x2’ excavations per pole.
Total Completed Inspections - 1
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 09/28/2026 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | Passed | Job has mobilized and started work on Sahuara, work hours will change once crew gets to poles on Golf Links. |