Permit Details

Status:
Fees Due
Type:
Right-of-Way (ROW) - Utility
Address NEW:
610 W CALLE MEDINA
Apply Date:
08/25/2026
Applicant:
Blair Montello
Description:
P-811251- (180-day permit) Transfer CenturyLink services from old utility pole to new foreign pole already in place. 11/20/26- renew permit for 30 days as of 11/27/26 new expiration date is 12/26/27

Permit Reviews

Permit Number - TR-UTL-0826-01434
Permit Status: Fees due
Permit Description: P-811251- (180-day permit) Transfer CenturyLink services from old utility pole to new foreign pole already in place. 11/20/26- renew permit for 30 days as of 11/27/26 new expiration date is 12/26/27
Start Date Submittal Complete Date Status  
08/25/2026 RIGHT-OF-WAY REVIEW v.1 09/21/2026 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TR-UTL-0826-01434
Permit Status: Fees due
Permit Description: P-811251- (180-day permit) Transfer CenturyLink services from old utility pole to new foreign pole already in place. 11/20/26- renew permit for 30 days as of 11/27/26 new expiration date is 12/26/27
Total Outstanding Activity Conditions - 7
Date Name
08/26/2026 A NOTICE OF TEMPORARY HOLIDAY RESTRICTION applies to this permit and will be in effect from November 26, 2026 to January 04, 2027. Due to the increasing traffic volume on many of the City’s roads, it is necessary to restrict lane closures on certain roads during the holiday season.
08/26/2026 Alley must be restored to existing or better condition. Alley surface must be graded and compacted to City Standards and Specifications for Public Improvements and existing drainage patterns must be restored and maintained. Any disturbed gravel must be replaced.
08/26/2026 Notify in writing at least 5 working days before work begins, any businesses, residences and public transit routes affected by your temporary traffic control. PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING.
08/26/2026 Pre- activity/construction meeting with City inspectors to be held 72 hours in advance of work start. Please request Inspections in your permit portal on TDC Online.
08/26/2026 Traffic control set-up approved between 9AM - 3:30PM
08/26/2026 Other Permits/Projects are or will be active in your project area. Please coordinate with the project manager in charge of any existing traffic control set-ups in your project area.
09/21/2026 Your project work requires that you contact City of Tucson Environmental Services Department (520-791-3171) at least 24 hours prior to closing any street or alley.

Completed Inspections

Permit Status: Fees Due
Permit Number: TR-UTL-0826-01434
Permit Description: P-811251- (180-day permit) Transfer CenturyLink services from old utility pole to new foreign pole already in place. 11/20/26- renew permit for 30 days as of 11/27/26 new expiration date is 12/26/27
Total Completed Inspections - 1
Date Description Inspector Results Comments
11/04/2026 TRSP - ROW - Barricade - Setup/Routine Passed

Documents

File Name Document Type  
COT - TR - ROW PERMIT (SSRS).PDF DOCUMENTS VIEW
P-811251 610 W CALLE MEDINA SITE PLAN_V1.PDF DOCUMENTS VIEW
QWS33941 ENG TCP_V1.PDF DOCUMENTS VIEW