Permit Details

Status:
Withdrawn
Type:
Right-of-Way (ROW) - Utility
Address NEW:
1901 W CALLE DEL OCIO
Apply Date:
08/25/2026
Applicant:
Ilana Galluzzo
Description:
CONTINUATION PERMIT FOR TR-UTL-0526-00792 - CREWS NEED TO COMPLETE FINAL PAVEMENT RESTORATION - 132FT OF 2" PE INSTALLED VIA OPEN TRENCH. WITH 5X5FT BELLHOLE AT TIE IN WITHIN ALLEY. WITHDRAWN AS OF 08/27/2026

Permit Reviews

Permit Number - TR-UTL-0826-01433
Permit Status: Withdrawn
Permit Description: CONTINUATION PERMIT FOR TR-UTL-0526-00792 - CREWS NEED TO COMPLETE FINAL PAVEMENT RESTORATION - 132FT OF 2" PE INSTALLED VIA OPEN TRENCH. WITH 5X5FT BELLHOLE AT TIE IN WITHIN ALLEY. WITHDRAWN AS OF 08/27/2026
Start Date Submittal Complete Date Status  
08/25/2026 RIGHT-OF-WAY REVIEW v.1 08/28/2026 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TR-UTL-0826-01433
Permit Status: Withdrawn
Permit Description: CONTINUATION PERMIT FOR TR-UTL-0526-00792 - CREWS NEED TO COMPLETE FINAL PAVEMENT RESTORATION - 132FT OF 2" PE INSTALLED VIA OPEN TRENCH. WITH 5X5FT BELLHOLE AT TIE IN WITHIN ALLEY. WITHDRAWN AS OF 08/27/2026
Total Outstanding Activity Conditions - 7
Date Name
08/26/2026 Alley must be restored to existing or better condition. Alley surface must be graded and compacted to City Standards and Specifications for Public Improvement and existing drainage patterns must be restored and maintained. Any disturbed gravel must be replaced.
08/26/2026 **Pre-Activity Meeting w/Inspections **Pre- activity/construction meeting with City inspectors to be held 72 hours in advance of work start. Please request Inspections in your permit portal on TDC Online. ** PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. ** PAVEMENT PATCH TYPE SHALL BE IN CONFORMANCE TO THE CURRENT EDITION OF THE CITY OF TUCSON PUBLIC UTILITY ADMINISTRTIVE MANUAL **Pedestrian Access & Sidewalk PEDESTRIAN ACCESS MUST BE PROVIDED AND MAINTIANED PER MUTCD CHAPTER 6D. FIELD ADJUSTMENTS MAY BE REQUIRED. REPLACE/REPAIR SIDEWALK PANELS PER PAG STANDARD DETAIL 200\206 . PEDESTRIAN DETOUR ROUTE ON SAME SIDE OF RIGHT OF WAY TO BE PROVIDED. PER CITY CODE AND POLICY. Refer to MUTCD Chapter 6 Figure 6P-28, and 6K figure 6K-2. Refer to COT Utility manual Page 41 – 42 Refer to COT 2015 Addition to the MUTCD section 14
08/26/2026 Traffic control set-up approved between 9AM - 3:30PM
08/26/2026 Other Permits/Projects are or will be active in your project area. Please coordinate with the project manager in charge of any existing traffic control set-ups in your project area.
08/28/2026 Alley Restrictions Alley must be restored to existing or better condition. Alley surface must be graded and compacted to City Standards and Specifications for Public Improvements and existing drainage patterns must be restored and maintained. Any disturbed gravel must be replaced.
08/28/2026 Lane closures shall only be permitted during active work operations. At the end of each workday, the contractor shall remove all traffic control devices and reopen the roadway, bike lanes, and sidewalks to normal operation. Twenty-four (24) hour lane closures are not permitted unless specifically approved by the City. Traffic Control Devices shall not be stored in the bike lane or sidewalk - The contractor shall restore all disturbed pavement in accordance with the City of Tucson Standard Specifications for Public Improvements and applicable standard details. All pavement patches shall match the existing pavement section and surface condition. The contractor shall maintain all temporary patches in a safe and drivable condition until permanent restoration is completed. Any settlement, cracking, or pavement failure within the patched area shall be repaired by the contractor at no cost to the City for the duration of the warranty period All excavations must be securely plated or backfilled at the end of each workday and during any period when the site is unattended. Plating shall be traffic-rated, flush with the surrounding surface, and properly secured to prevent movement and to maintain public safety
08/28/2026 Private Property Driveways and private property shall NOT be utilized without the owner’s consent. It is the contractor’s responsibility to negotiate use of private property.

Documents

File Name Document Type  
1901 W CALLE DEL OCIO_V1.PDF DOCUMENTS VIEW
DESIGN PLAN-UPDATED 03.20.26 - 36_5086233 ENCLAVES AT TUMAMOC LOTS 1-31-C1_V1.PDF DOCUMENTS VIEW
N CAMINO SANTIAGO AERIAL SNIP_V1.PDF DOCUMENTS VIEW