Permit Details

Status:
Fees Due
Type:
Right-of-Way (ROW) - Utility
Address:
3611 N CACTUS BL
Address NEW:
3611 N CACTUS BL
Apply Date:
08/25/2026
Applicant:
Adrien Pineda
Description:
ARIZONA PIPELINE CO WILL NEED TO EXCAVATE (1) 25X3 TRENCH ACROSS ASPHALT ROAD IN ORDER TO REPLACE GAS SERVICE FOR 3611 N CACTUS RD - ARIZONA PIPELINE CO WILL BE WORKING 3 DAYS OUT OF THE 90 DAY PERMIT - TRAFFIC CONTROL WILL BE SCHEDULED 3 DAYS OUT OF THE 90 DAYS

Permit Reviews

Permit Number - TR-UTL-0826-01432
Permit Status: Fees due
Permit Description: ARIZONA PIPELINE CO WILL NEED TO EXCAVATE (1) 25X3 TRENCH ACROSS ASPHALT ROAD IN ORDER TO REPLACE GAS SERVICE FOR 3611 N CACTUS RD - ARIZONA PIPELINE CO WILL BE WORKING 3 DAYS OUT OF THE 90 DAY PERMIT - TRAFFIC CONTROL WILL BE SCHEDULED 3 DAYS OUT OF THE 90 DAYS
Start Date Submittal Complete Date Status  
08/25/2026 RIGHT-OF-WAY REVIEW v.1 08/28/2026 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TR-UTL-0826-01432
Permit Status: Fees due
Permit Description: ARIZONA PIPELINE CO WILL NEED TO EXCAVATE (1) 25X3 TRENCH ACROSS ASPHALT ROAD IN ORDER TO REPLACE GAS SERVICE FOR 3611 N CACTUS RD - ARIZONA PIPELINE CO WILL BE WORKING 3 DAYS OUT OF THE 90 DAY PERMIT - TRAFFIC CONTROL WILL BE SCHEDULED 3 DAYS OUT OF THE 90 DAYS
Total Outstanding Activity Conditions - 4
Date Name
08/28/2026 Bike Lane Access and Accommodation 1) Posted Speeds 30 Mph or Less – Less than 14 lane - Use of the R4-11 alone is acceptable and preferred over Share The Road sign - 2) Posted Speeds 30 Mph or less – greater than 14 lane - Use of Share The Road sign is preferred 3) Posted Speeds 30 Mph or More – Any Lane Size - Provide a reasonable alternative for cyclists, such as a paved path, space behind barricades, or bike detour. Acceptable to direct cyclists to the sidewalk when properly signed depending on conditions 4) Bike lane to be maintained within Traffic Control closure and Share may Pedestrian detour path with proper R9-6 Sign.
08/28/2026 Pre-Activity Meeting w/Inspections Pre- activity/construction meeting with City inspectors to be held 72 hours in advance of work start. Please request Inspections in your permit portal on TDC Online. PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING.
08/28/2026 Private Property Driveways and private property shall NOT be utilized without the owner’s consent. It is the contractor’s responsibility to negotiate use of private property.
08/28/2026 Traffic Control set-up approved between 7AM - 5PM

Documents

File Name Document Type  
3611 N CACTUS BLVD SITE_V1.PDF DOCUMENTS VIEW
3611 N CACTUS BLVD TCP_V1.PDF DOCUMENTS VIEW