Permit Details

Status:
Fees Due
Type:
Right-of-Way (ROW) - Utility
Address:
651 W INEZ PL
Address NEW:
651 W INEZ PL
Apply Date:
08/24/2026
Applicant:
ANGEL MORALES
Description:
P.360535C Overbuild: Bore 1265' and trench 17' to place conduit and fiber cable Place 3683' of aerial fiber cable Place 9 pedestals/cabinets/vaults

Permit Reviews

Permit Number - TR-UTL-0826-01425
Permit Status: Fees due
Permit Description: P.360535C Overbuild: Bore 1265' and trench 17' to place conduit and fiber cable Place 3683' of aerial fiber cable Place 9 pedestals/cabinets/vaults
Start Date Submittal Complete Date Status  
08/25/2026 RIGHT-OF-WAY REVIEW v.1 09/15/2026 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TR-UTL-0826-01425
Permit Status: Fees due
Permit Description: P.360535C Overbuild: Bore 1265' and trench 17' to place conduit and fiber cable Place 3683' of aerial fiber cable Place 9 pedestals/cabinets/vaults
Total Outstanding Activity Conditions - 4
Date Name
08/25/2026 **Pre-Activity Meeting w/Inspections **Pre- activity/construction meeting with City inspectors to be held 72 hours in advance of work start. Please request Inspections in your permit portal on TDC Online. ** PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. ** PAVEMENT PATCH TYPE SHALL BE IN CONFORMANCE TO THE CURRENT EDITION OF THE CITY OF TUCSON PUBLIC UTILITY ADMINISTRTIVE MANUAL **Pedestrian Access & Sidewalk PEDESTRIAN ACCESS MUST BE PROVIDED AND MAINTIANED PER MUTCD CHAPTER 6D. FIELD ADJUSTMENTS MAY BE REQUIRED. REPLACE/REPAIR SIDEWALK PANELS PER PAG STANDARD DETAIL 200\206 . PEDESTRIAN DETOUR ROUTE ON SAME SIDE OF RIGHT OF WAY TO BE PROVIDED. PER CITY CODE AND POLICY. Refer to MUTCD Chapter 6 Figure 6P-28, and 6K figure 6K-2. Refer to COT Utility manual Page 41 – 42 Refer to COT 2015 Addition to the MUTCD section 14
08/25/2026 BUS STOP IN THE AREA, CONTACT SUN TRAN DISPATCH, AT 520-206-8934 AT LEAST 48-BUSINESS HOURS PRIOR TO START OF WORK FOR COORDINATION.
08/25/2026 PAVEMENT MORATORIUM: ANY NEW ASPHALT THAT IS DISTURBED WILL REQUIRE A 2” MILL AND OVERLAY FOR 25’ IN EACH DIRECTION FROM THE OUTSIDE OF THE CUT FOR ALL EFFECTED TRAVEL LANES.
08/25/2026 Traffic control set-up approved between 9AM - 3:30PM

Documents

File Name Document Type  
DESIGN PLAN-P.360535C - TUCSON - PERMIT DESIGN 7-29-26-A1_V1.PDF DOCUMENTS VIEW
P.360535C AERIAL SITE MAP_V1.PDF DOCUMENTS VIEW
P.360535C COMBINED TCPS_V1.PDF DOCUMENTS VIEW